Help center
SureCon help center: step-by-step guides
New to SureCon?
Learn SureCon in 30 minutes
Follow these guides in order. Each one takes a few minutes, and the demo project lets you try every step without touching real data.
- 1Set up your first project10 min
- 2Explore a sample project5 min
- 3Invite your team and contractors4 min
- 4Message your team and comment on anything4 min
- 5Add systems and import your tag register8 min
- 6Raise, fix, verify and close punch items5 min
- 7Use SureCon on your phone3 min
- 8Keep a daily log5 min
- 9View drawings and pin issues on them4 min
- 10Work with document revisions3 min
- 11Undo mistakes and see who changed what3 min
- 12Reports, trackers and analysis4 min
- 13See all your projects in the portfolio2 min
Also in Español and Português.
New to completions itself? Take the free Completions academy: short lessons on how completions works, how to set it up and how to make sure nothing is missed.
Start here
- Set up your first projectFrom sign-up to your first punch item in about ten minutes. 10 min
- Invite your team and contractorsRoles, company-wide access and project invitations explained. 4 min
- Add systems and import your tag registerSet up the structure everything else hangs on, and get check sheets for every tag. 8 min
- Work faster: grid editing, punch from a photo, AI change summaries and starter packsEdit many punch items at once, raise items from a photo, see what changed on a drawing, and start projects pre-set for your industry. 4 min
- Use SureCon on your phoneInstall it to your home screen today. Native apps are coming soon. 3 min
- Create custom rolesRoles that match your project, with modules read only or hidden. 3 min
- Explore a sample projectOpen a filled-in data centre, LNG, mining or pump station project and see every module working. 5 min
- Set up a project properlyGo through the Setup tabs once, in order, so every punch, sheet and report lands in the right place. 6 min
- Playbook: completions managerWhat to do each day, week and milestone to keep completions on track. 5 min
- Playbook: QA/QC inspectorHow to work through inspections, check sheets and punches efficiently in the field. 4 min
- Playbook: contractor and subcontractorSee your own items, fix them, and get paid sooner by closing out cleanly. 3 min
- Playbook: commissioning leadMake sure each system is really ready before you energise or put fluid in it. 4 min
- Playbook: client and ownerFollow progress, witness hold points and accept the handover with confidence. 3 min
Field work
- Raise, fix, verify and close punch itemsThe punch workflow from open to closed, and who does what. 5 min
- Run a walkdownInspect one subsystem and raise items quickly, with your choices remembered. 3 min
- Use SureCon on site without signalInstall the app on your phone and raise items in basements, tunnels and remote sites. 3 min
- Keep a daily logWeather, crews, equipment, work done, delays and photos, signed off every day. 5 min
- View drawings and pin issues on themOpen the current revision on site, zoom in and drop pins for punch items, NCRs and notes. 4 min
- Mark up drawings, outline systems and compare revisionsClouds, notes and links on layers, system boundaries with their progress, and what changed between revisions. 5 min
- Keep equipment preserved until handoverSet up routines for rotating, energising and inspecting stored or installed equipment, and record each check on site. 4 min
Quality & safety
- Fill in and sign check sheetsComplete ITRs on a phone, with readings checked against limits. 4 min
- ITPs, inspections and NCRsPlan inspections, record results and close out nonconformances. 6 min
- Permits, LOTO and other registersNumbered records with their own workflow: permits, isolations, issues, tasks and more. 5 min
- Submit and review documents (redlines, weld maps, test packs)Contractors submit; client field engineering reviews on screen with AI-assisted checks. 6 min
- Set up the spec book and track required submittalsAdd spec sections, find the submittals each one requires, and follow them to approval. 4 min
- Raise and answer technical queries (TQs)Ask engineering a question, get a recorded answer, and stop work waiting on emails. 3 min
- Control changes with management of change (MOC)Record what changes and why, get it approved, and make sure every affected tag and document is updated. 4 min
- Track welds, welders and NDESee every joint's state, NDE result and test pack, and spot welders with high repair rates. 3 min
Handover
- Certificates and turnover packagesFrom mechanical completion to final acceptance, worked out from your records. 6 min
- Measure progress and plot the S-curveEarned against planned progress, worked out from check sheets, test packs and certificates. 4 min
- Swap data with P6, Microsoft Project, Excel and COBieMilestones to and from planning tools, Excel round-trips and a COBie handover workbook. 4 min
- Share punch items with subcontractors and collect e-signaturesSecure links for people without an account, and e-signatures with a full audit trail. 5 min
- Work with document revisionsThe latest revision opens by default. Here's how to find, compare and flag older ones. 3 min
- Track turnover with skylinesPlan milestone dates, then follow skylines, check sheet status and commissioning progress live. 5 min
- Plan and record commissioning activitiesKeep a register of commissioning activities per system, with procedures, planned dates and results. 3 min
- Track work orders and preventive maintenanceLog breakdowns and repairs, and schedule recurring maintenance on handed-over equipment. 3 min
- Close out contracts without loose endsA checklist per contract of everything needed before final payment and release. 3 min
- Find what's been missed with GapsOne list of everything easy to miss before handover: tags with no sheets, items with no owner, overdue documents and more. 3 min
Tools
- Two-step sign-in and company security settingsProtect your account with an authenticator app, and set rules for your company. 4 min
- API reference: connect your own systemsRead projects, systems, tags, check sheets, punch items and documents, raise punch items, and receive webhooks. 6 min
- Build your own reports and email them on a schedulePick columns, filters and a grouping; download as Excel or PDF, or have it emailed every week. 4 min
- Import, export, share and print QR labelsMove punch lists in and out, share them with outsiders, and label equipment. 5 min
- My work and email notificationsSee everything waiting for you, and when SureCon emails you. 3 min
- Ask AI about your project's documentsUpload specs and procedures, then ask questions and get answers with sources. 4 min
- Undo mistakes and see who changed whatUndo buttons, Recently deleted and the activity log. 3 min
- See all your projects in the portfolioOne screen with every project's punches, quality, safety, documents and progress. 2 min
- Run meetings and track actionsAgenda, attendance, minutes from your notes, and actions that don't get lost. 4 min
- Design your own formsBuild inspections, checklists, requests and reports with their own fields and workflow. 5 min
- Reports, trackers and analysisWeekly reports, punch analysis and management dashboards as PDF, and Excel trackers for your own analysis or BI tools. 4 min
- Use the knowledge libraryKeep the scope, specifications, plans and reports in one place, with versions, and let Ask AI answer from them. 3 min
- Message your team and comment on anythingTeam chat, direct and group messages, and discussions with @mentions on every record. 4 min
- Use the project calendarSee inspections, walkdowns, meetings, tests and due dates in one place, and plan events. 3 min
- To-dos, reminders and the rosterKeep your own list with reminders, and plan who is on site each day. 4 min
- Track time and approve LEM sheetsTimesheets by cost code, a rate card, and daily labour, equipment and materials sheets for billing. 5 min
- Find any documentSearch every document on the project in one place. 2 min
- Replace spreadsheets with trackersImport a spreadsheet or pick a template to make a shared project database. 4 min
- Keep manufacturer documents and IOM manuals in one placeStore IOMs, datasheets, preservation recommendations, spares lists and warranties by manufacturer and equipment, linked to tags. 3 min
- Track, print and export check sheets (ITRs)See ITR status by tag and subsystem, print sheets for work packs, verify in bulk and export the completions database. 4 min
- Favourite documents, the current IFC and sharing linksKeep the documents you use at hand, always build from the current IFC, and share links, not copies. 3 min
- Assign work and run a task boardGive tasks and to-dos to each other, move them across a Kanban board, and share post-its. 3 min
- Run a safety, quality or environmental auditPlan, audit against the checklist, raise findings, report and close out. 4 min
- Track materials from take-off to installedLoad the MTO, follow orders and deliveries, and issue stock to the field. 4 min
- Run progress claims against the bill of quantitiesClaim, check and certify quantities each period, with retention and variations. 4 min
- Run piping test packs and weld mapsBuild a test pack, track its welds to acceptance, and test, reinstate and close it. 5 min
- Transmit documents between client, EPCM and contractorsIssue exact revisions with a reason, get them acknowledged and answered with return codes. 5 min
- Share files in project foldersContracts, markups, photos, letters and reports in folders everyone on the project can reach. 3 min
- Keep notes for yourself or the teamPrivate notes, or shared ones everyone on the project can read. 2 min
- Read the punch dashboardKnow at a glance what's open, who's holding it up and which subsystems are furthest behind. 3 min
- Plan crews and keep certifications currentSee who is where each week, and catch expired tickets before someone works without one. 3 min
- Track issues, tasks and lessons learnedSimple registers for the things that aren't punches: blockers, actions and what to do better next time. 3 min
Frequently asked questions
What is SureCon?
SureCon is one place to run the finishing stages of a construction project: completions, quality, safety, documents, procurement, people, maintenance and commissioning. It replaces the spreadsheets, email chains and paper binders that usually hold this information.
Is it really 100% free?
Yes. SureCon is free to use, with no credit card, no per-user fees and no limit on projects. We'd rather have every crew on site using it than a few paying for it.
When can I start using it?
Today. SureCon is in public beta: create a free account, set up your project and invite your team in a few minutes.
Who is it for?
Owners, EPC contractors, subcontractors, commissioning teams, QA/QC inspectors, safety officers and project managers. Each person gets a role, and sees and does what that role allows.
What kinds of projects does it support?
Any kind of construction: oil and gas, LNG, data centers, mining, power and renewables, commercial and public buildings, infrastructure, water, pharmaceuticals and manufacturing. If it has systems, tags and a handover, SureCon fits.
Can I try it before setting up my own project?
Yes. After you sign up, open a filled-in sample project in one click: a small data centre, a small LNG plant, a small mining plant or a water pump station, complete with punch lists, tags, check sheets, inspections and handover certificates.
Does it work on site without signal?
Yes. You can install SureCon on your phone like an app. Punches you raise without signal are saved on the device and upload when you're back online. You can even dictate them by voice.
Is there a mobile app?
Mobile apps for iPhone, iPad and Android are coming soon. You don't have to wait: SureCon already works in your phone's browser, and you can add it to your home screen so it opens like an app, works offline and takes photos.
Who owns my data?
You do. Each project's data belongs to that project and is only visible to the people you invite. Your AI conversations and the things the assistant remembers are private to you, and are never used to train AI models.
How does the AI assistant work?
Add your specifications, procedures and codes to the project's knowledge library and switch them on for AI. When you ask a question, SureCon looks up the relevant passages and answers with numbered sources, so you can check every claim.
Can I bring in my existing spreadsheets?
Yes. Systems, tags, and cable, piping and other schedules import from CSV files, including progress you've already recorded. Re-importing updates what's there.
Can we change the workflows to match our procedures?
Yes. Project admins can rename statuses, add steps, choose who can approve what, and add their own fields, all from the setup screen, without code.
Can I export my records?
Yes. Punch lists export to PDF, Excel and CSV, and certificates and reports are ready to print or share with your client.
How does SureCon handle document revisions?
Every document keeps its full revision history. The latest revision always opens by default. To see an older one, click the revision number and pick it: a red warning tells you it's out of date, and old PDFs are stamped SUPERSEDED on every page.
What if someone deletes something by mistake?
Press Undo in the message that appears straight after the delete. Deleted items also stay in the project's Recently deleted list for 30 days, where an admin or the person who added them can restore them.
Can I see who changed what?
Yes. Every change is logged with who made it and when. Project admins see the log on the project's Activity & undo page, and company admins see it across all projects.
Does SureCon cover safety and quality?
Yes. Safety covers permits to work, LOTO, JSAs, field-level hazard assessments, risk assessments, and safety observations and incidents. Quality covers ITPs, inspections with hold and witness points, surveillance, NCRs and audits. The portfolio shows both across all your projects.
Can contractors send documents for the client to review?
Yes. Contractors submit redlines, weld maps, test packs, shop drawings and more. Client field engineering reviews them on screen, pins comments on the drawings, and gets an AI pre-review that checks every package against the same checklist and the project's specifications. They return it with a code, and the contractor resubmits as a new revision.
Can I view and mark up drawings on site?
Yes. Open any drawing from document control on a phone or tablet, zoom in, and drop a pin to raise a punch item, link an NCR or query, or leave a note right where the issue is.
Does it do daily reports?
Yes. The daily log records weather (filled in automatically), crews, equipment, work done, delays, incidents and photos. Submit it for approval and share it as a PDF.
We run many projects. Can managers see them all at once?
Yes. The portfolio lists every project you can see with open and overdue punches, NCRs, inspections, safety events, documents waiting for review and check-sheet progress, with the projects that need attention first.
Does it work for small projects and small teams?
Yes. A two-person crew can set up a project in minutes and use only what they need: switch off modules you don't use in Setup, and turn them on later as the project grows.
How do I learn to use it?
Start with the step-by-step guides in the help center. The 30-minute learning path walks you through the essentials in order, and every screen in the app has a short explanation at the top.
Is my data secure?
All traffic is encrypted, files are stored privately, each project is only visible to the people invited to it, and every change is logged. See the security page for the details.
Does SureCon have reports and dashboards?
Yes. Every project has live dashboards, and Reports & trackers builds a weekly progress report, punch list analysis, commissioning status report and management dashboard as PDF from the project's current data, whenever you need them.
Can I analyse the data in Excel or Power BI?
Yes. Punch, document, submittal, action, commissioning and materials trackers download as Excel workbooks with filters on every column, ready for pivot tables, Power BI or Tableau. Every list can also be exported on its own.
Do the sample projects include documents and drawings?
Yes. Each sample has drawings (P&IDs, single line diagrams, loop diagrams, layouts) with revisions and punch items pinned on them, specifications and procedures, turnover documents, submittal files, and a library with the scope of work, basis of design, execution plan, plans, reports and trackers.
Can my team message each other in SureCon?
Yes. Every project has a team chat, and you can send direct or group messages to anyone you share a project or company with. Most records, from NCRs and technical queries to drawings, check sheets and meetings, also have a discussion where you can @mention someone: they get a message with a link and an email.
Is there somewhere to share files with the whole project?
Yes. Every project has shared folders for contracts, markups, photos, correspondence, reports and handover. Files up to 50 MB each are stored privately on Cloudflare R2 and only people on the project can open them. Deleted files can be restored for 30 days.
Are there tutorials to learn each module?
Yes. Learn (at the top of the app) has a quick tutorial for every module and a walk through the whole platform. Each one opens the right pages and points at the buttons as it goes. On any project page the graduation-cap button plays the tutorial for that page.
Is there a project calendar?
Yes. Each project has a calendar that brings together meetings, ITP inspections, surveillance, walkdowns, commissioning tests, deliveries and due dates from every module. Your team can plan walkdowns, FATs, deliveries and shutdowns on it, and download it as an .ics file for Outlook, Google or Apple calendars.
Can SureCon do rosters and FIFO rotations?
Yes. Each project has a roster: people down the side, days across, with day and night shifts, R&R, travel, leave, sick and training. Apply a rotation such as 8/6, 14/14, 21/7 or a 2-2-3 panama to a whole crew at once, see the daily headcount on site, and download it as CSV.
How does SureCon handle transmittals between the client, EPCM and contractors?
Each transmittal records who it's from and to (client, EPCM, contractor or vendor), the reason for issue (IFR, IFA, IFC and so on) and the exact revisions. IFC transmittals only accept IFC revisions. Recipients are notified with a link (files are never attached), acknowledge receipt and answer with a return code per document by the due date. Overdue responses are flagged and a PDF cover sheet is one click.
Does SureCon handle piping test packs and weld maps?
Yes. Each test pack holds its lines, isometrics (always at their current revision, with non-IFC revisions flagged), test type and pressures, and moves from preparation to walkdown, ready for test, tested, reinstated and closed. It can only move on when its readiness checks are done and every weld on its weld map is accepted. The weld log records welder, WPS, visual and NDE results and repairs, shows welder repair rates and exports to Excel.
Can SureCon track materials and do quantity surveying?
Yes. The material tracker follows each line from take-off to installed: ordered, received with heat numbers, in store, issued and installed, flagging lines not ordered, short ordered or late. Quantity surveying keeps the bill of quantities with variations and runs monthly progress claims: the contractor claims quantities to date, the client's QS adjusts and certifies, and the valuation takes off retention and previous certificates. Both export to Excel.
Can we run safety and quality audits in SureCon?
Yes. Plan safety, quality and environmental audits with checklists following ISO 45001, 9001 and 14001. Answer each question on site; minor and major non-conformances become findings with a corrective action, an owner and a due date. The audit is scored, reported, and closed only when every finding's close-out has been verified. Open and overdue actions are listed across all audits.
Can we assign tasks to each other and use a Kanban board?
Yes. Tasks, issues and any register or tracker show as a Kanban board with a column per status; drag cards to move them through the workflow. Assign a task as you add it and the person is notified. You can also give someone a to-do from your own list and see when it's done, and the team shares a post-it wall for ideas and look-aheads.
How does SureCon make sure people build from the latest IFC drawing?
Every controlled document and drawing shows whether its newest revision is issued for construction. If a newer revision is out for review, SureCon shows which IFC revision to build from and opens it, and superseded revisions are stamped. People star the documents they use and their favourites always point at the current IFC. Files are shared as links, never attachments, so there's one copy and nobody works from an old download.
Does SureCon do what dedicated completions systems do: ITRs, punch, certificates, reports and exports?
Yes. Tags get their check sheets (ITRs) from templates by type; an ITR matrix shows every tag against every sheet by subsystem; sheets print as completed records or blank forms with QR codes and can be verified in bulk. Punch items are categorised and block certificates; MC, RFC, RFSU and handover certificates are signed in sequence; skylines and status reports are live; and the whole completions database exports to Excel.
Where do manufacturer manuals and IOMs go?
In Manufacturer docs & IOMs: installation, operation and maintenance manuals, datasheets, installation instructions, storage and preservation recommendations, spare parts lists, warranties and certificates, grouped by manufacturer and equipment and linked to their tags. Each is stored once and shared by link, and Ask AI can answer questions from them with the source.
Can we move our tracking spreadsheets into SureCon?
Yes. Import an Excel or CSV file and it becomes a tracker: each column becomes a field (with its type worked out for you) and each row a record with its own number, status, history and comments. Or start from a template such as a weld log, cable pull tracker, pressure test log or calibration register. Everyone works on the same live list instead of copies, and it exports back to Excel any time.
How do people find the document they need?
All documents lists every document on a project in one place: controlled documents and drawings at their latest revision, turnover documents, submittals, specifications, the knowledge library, shared files and attachments. Search by number or words, filter by source, discipline, type or status, open the file, or export the list to Excel.
Are there engineering conversion tables?
Yes, free and open to everyone at surecon.com/tools/conversions, and built into the app (the calculator button at the top). Convert pressure, flow, torque, power, energy, temperature and more, work out three-phase current, and look up pipe sizes and schedules, AWG to mm², metric bolt spanner sizes and IP ratings.
Does SureCon have turnover skylines and check sheet status trackers?
Yes. The Turnover tracker shows a skyline for each milestone (MC, RFC, RFSU, handover, final acceptance) against planned dates, a turnover and check sheet status table for every subsystem, and a commissioning tracker with B and C check sheets and commissioning activities. It's all built live from the project's records and exports to Excel.
Can SureCon do timesheets and LEM sheets for billing?
Yes. People log hours by cost code each week and submit them for approval. Contractors fill in daily LEM sheets (labour, equipment and materials) priced from the project's rate card, with crew pulled from the roster. The client approves them, and they print to PDF and export to Excel for invoicing.
Does SureCon have to-dos and reminders?
Yes. Everyone has their own to-do list, across projects or per project, with due dates, priorities and reminders that pop up in SureCon and arrive by email.
Can I keep my own notes on a project?
Yes. Notes are private by default, or you can share one with everyone on the project, for things like site rules, contacts and reminders.
Coming soon
SureCon apps for iPhone, iPad and Android
Native apps are on the way. You don't have to wait: SureCon already works in your phone's browser. Add it to your home screen and it opens like an app, takes photos and keeps working without signal.
- Coming sooniPhone & iPad
- Coming soonAndroid
Still stuck?
Use Feedback in the app header, or contact us. A person reads every message. You'll also find terms explained in the glossary.