Start here
Explore a sample project
Open a filled-in data centre, LNG, mining or pump station project and see every module working.
- 1
Open a sample
On the projects page, tap Explore a sample project and pick one: a small data centre, a small LNG plant, a small mining plant or a pump station. It's ready in a few seconds, in your own company.
- 2
Take the tour
The yellow banner at the top of the sample has Show me around: links to the best places to look and things to try for that industry.
- 3
Work it like a real project
Raise a punch item with a photo, mark one ready and close it, sign a check sheet, open a drawing and look at the punch items pinned on it. Nothing you do affects anyone else.
- 4
Look at the documents
Documents and Drawings have real PDFs with revisions (older ones open stamped SUPERSEDED). The knowledge library holds the scope of work, basis of design, execution plan, plans and procedures.
- 5
Run the reports
Reports & trackers builds a weekly report, punch analysis, commissioning status and management dashboard as PDF, and trackers as Excel, from the sample's live data.
- 6
Delete it when you're done
Admins see Delete demo in the banner. Your real projects aren't touched.