What's new
What's new in SureCon: product updates
SureCon is in public beta and changes every week. Here's what shipped.
The academy and Learn SureCon guides in Spanish and Portuguese
- All 14 Completions academy lessons in Español (/es/academy) and Português (/pt/academy).
- The 13 Learn SureCon guides in both languages (/es/help, /pt/help), with links between languages on every page.
Screenshots in the help guides and printable checklists
- Most help guides now open with a screenshot of the screen they explain.
- Two new free templates to print: the completions manager's checklist and a commissioning readiness checklist (PDF).
The Completions academy by email
- Sign up on the academy page to get one lesson by email every two days. You confirm first, and every email has a one-click unsubscribe.
Academy quizzes and certificates
- Each Completions academy lesson now has a short quiz. Your progress is saved under Learn → Completions academy.
- Pass all 14 to get a PDF certificate with a code anyone can check at surecon.com/academy/verify.
Gaps page and help on every screen
- Gaps (Reports → Gaps) lists everything easy to miss before handover: tags with no check sheets, punch items with no company or due date, overdue items, stalled or unverified sheets, overdue documents, preservation and technical queries.
- A help button next to the tutorial button opens the guide for the page you're on.
Completions academy and 16 new help guides
- The Completions academy: 14 free lessons on how completions works, setting it up, check sheet phases, not missing anything, KPIs, commissioning readiness and handover.
- Playbooks for completions managers, inspectors, contractors, commissioning leads and clients.
- New help guides for project setup, preservation, technical queries, management of change, commissioning, maintenance, weld maps, the punch dashboard, crews and certifications, contract close-out, and issues, tasks and lessons learned.
Grid editing, AI from photos and drawings, install, starter packs
- Edit punch items as a grid: type in cells, paste from Excel, fill down, save once.
- Raise a punch item from a photo: AI describes the defect and fills in the fields.
- Summarise what changed between two drawing revisions with AI.
- Submittal pre-review checks the specification section's required submittals.
- Install SureCon on phones and computers in one tap (with steps for iPhone).
- Industry starter packs for new projects: systems, modules and progress weights ready to go.
Report builder, scheduled reports and email settings
- Build your own reports from punch items, check sheets, tags or documents: columns, filters, grouping and sort, as Excel or PDF.
- Email any standard or custom report daily, weekly or monthly to people on the project, at a time in your own time zone.
- Settings → Email: choose which notifications to get, and a daily or weekly summary of what's waiting on you.
Outside parties and e-signatures
- Send a subcontractor or vendor a secure link to their punch items: they comment and mark items ready, no account needed. Links expire and can be revoked.
- Ask clients and vendors to e-sign certificate steps and documents: email confirmed by a one-time code, drawn or typed signature, explicit consent.
- Every signature keeps an audit trail (times, network addresses, devices and a SHA-256 fingerprint of what was signed), downloadable as a PDF.
API, webhooks, P6 / MS Project, Excel round-trip and COBie
- A REST API with company API keys: read projects, systems, tags, check sheets, punch items and documents, and raise punch items.
- Webhooks send every recorded change, signed, to your own systems.
- Export turnover milestones to Microsoft Project and Primavera P6, and import planned dates from a .xer or .xml schedule.
- Edit tags and planned dates in the completions workbook and import it back.
- COBie 2.4 handover workbook for the owner's maintenance system.
Drawing markups, system boundaries and revision compare
- Mark up drawings with pen, clouds, boxes, arrows and text, on layers you can show or hide, shared or just for you.
- Outline subsystems on drawings; tap an outline to see its check sheet completion and open punches.
- Drawing numbers printed on a sheet link straight to that drawing, and you can add your own link areas.
- Compare two revisions: removed linework in red, added in blue.
Two-step sign-in and company security settings
- Two-step sign-in with an authenticator app, with one-time recovery codes (Settings → Security).
- See where you're signed in and sign out other devices.
- Company owners and admins can require two-step sign-in, limit access to approved networks and set how often people sign in again (Team → Security).
- The security page now lists these controls and where we are on certifications.
Progress measurement and S-curve
- Turnover → Progress works out earned progress from check sheets, test packs and certificates, and compares it with the plan from each subsystem's MC, RFC and RFSU dates.
- An S-curve of planned against earned, with variance and schedule performance (SPI).
- Breakdowns by category, discipline and subsystem, with an Excel export.
- Admins can set how much each category counts.
Work offline in the field
- Check sheet answers and sign-offs, weld results, test pack readiness checks, preservation records and audit answers made without signal are kept on the device and sent automatically when the connection returns, alongside offline punches.
- Save for offline (on Check sheets and the ITR matrix, with a subsystem picked) downloads that subsystem's check sheets, test packs, weld map, preservation and punch list so they open with no signal.
- While offline, links between saved pages keep working.
- A change the server can no longer accept (for example, a sheet someone else already signed) stays on the device with the reason, so nothing is lost silently.
Preservation from manufacturer documents, heat tracing check sheets, calendar and phone fixes
- Set up preservation from a manufacturer's storage and preservation recommendations: SureCon reads the routines and intervals from the document and adds them to every tag it covers, naming the document as the source.
- Heat tracing circuits get a construction check sheet (E-A06) with the three insulation resistance tests (on receipt, after installation, after insulation) and installation checks; the commissioning sheet adds load current, earth-leakage trip and alarm tests.
- The calendar shows test pack pressure tests, planned safety, quality and environmental audits, and expected material deliveries.
- Phones: less-used header buttons move into a More menu so the bar fits the screen, wide tables no longer stretch the page, and the material tracker shows each line's status without scrolling sideways.
Manufacturer documents and heat tracing samples
- Manufacturer docs & IOMs: IOM manuals, datasheets, installation instructions, storage and preservation recommendations, spare parts lists, warranties, certificates and vendor drawings by manufacturer and equipment, linked to tags and readable by Ask AI.
- Sample projects include manufacturer documents for pumps, motors, control valves, switchboards and electric heat tracing.
- Sample electric heat tracing (EHT) documents: circuit layouts, two sheets of typical installation details, the circuit schedule, heat loss calculation, specification and installation and testing procedure.
ITR matrix, printed check sheets and completions export
- ITR matrix: every tag against every check sheet type by subsystem, coloured by status, with totals per sheet type and subsystem, filters and Excel export.
- Print check sheets as PDF, one or a whole subsystem: completed records with results and sign-offs, or blank forms for site, each with a QR code back to the sheet.
- Verify all completed check sheets in a filter at once (admins and inspectors).
- Completions database export: systems, subsystems, tags, check sheets, punch, certificate signatures and deliverables in one Excel workbook.
Favourites, current IFC, link sharing and one photo library
- Star documents, drawings, files and specs in All documents; your favourites sit at the top and open the current IFC revision.
- Each controlled document and drawing shows whether its newest revision is IFC, and which revision to build from when it isn't. Document and drawing pages warn and switch to it.
- Share link on documents, drawings, files and photos: copy the link or send it by message and email. Files stay in one place and are never sent as attachments.
- Photos now also gathers images in shared files and register attachments, with search by caption, tag or who took it.
Task board, post-it wall and giving to-dos
- Kanban board for tasks and any register or tracker: a column per status, drag a card to take the workflow step, or use Move on the card.
- Add a task and assign it in one line; filter the board to your own cards, someone else's or unassigned ones.
- Give a to-do to someone on the project: it lands on their list with a message and an email, and you're told when it's done.
- A shared post-it wall per project: coloured notes you drag into place, kept in step for everyone.
Safety, quality and environmental audits
- Plan audits with checklists following ISO 45001, ISO 9001 and ISO 14001, and answer them on site with evidence notes.
- Minor and major non-conformances become findings with a corrective action, owner and due date; overdue actions are flagged.
- Scores with Good, Satisfactory and Unsatisfactory bands; reports can't be issued until every question is answered and every non-conformance has an owner.
- Close-outs are verified by an admin or inspector, and an audit closes only when none are left open.
- Sample projects include six audits: closed, reported with open and overdue findings, in progress and planned.
Material tracker and quantity surveying
- Material tracker: take-off, ordered, received, in store, issued and installed for every line, with lines not ordered, short ordered or late flagged.
- Stock moves with receiving reports, heat numbers, issue vouchers and returns; stock can't be issued beyond what's in store.
- Quantity surveying: bill of quantities with variations, and monthly progress claims that are claimed, adjusted, certified or returned.
- Valuations with value to date, retention, previous certificates and the amount due, exported to Excel.
- Sample projects include 20 material lines with deliveries and issues, a 15-line bill and three progress claims.
Piping test packs and weld maps
- Test packs: lines, isometrics, test type, design and test pressure, hold time and witnesses, moving from preparation to walkdown, ready for test, tested, reinstated and closed.
- Readiness checks for each stage; a pack can't move on until they're done and every weld is accepted. Admins and inspectors sign off the test and close the pack.
- Isometrics open at their current revision, and a revision that isn't IFC is flagged.
- Weld maps: paste welds from your weld log, record visual and NDE results and repairs, filter by ISO, line, welder, NDE or pack, see welder repair rates and export to Excel.
- Sample projects include five test packs at different stages with their isometrics and 62 welds.
Transmittals and reviews to document control practice
- Transmittals between client, EPCM, contractors and vendors: reason for issue (IFI, IFR, IFA, IFC, IFT, IFU, as-built, for record), response due in working days, distribution list, acknowledgement of receipt and a return code per document.
- IFC transmittals only accept revisions issued for construction; superseded revisions are flagged on the transmittal.
- Files are linked, never attached: recipients get a message and email with a link, and the PDF cover sheet lists links to each file.
- Review checklists for redlines, weld maps, test packs and every other submittal type, answered by the reviewer. A failed check can't be approved.
- Sample projects now include test pack, redline and weld map reviews at every stage, and transmittals between client, EPCM and contractor.
Trackers: spreadsheets into shared databases
- Import an Excel or CSV file as a tracker: column types (text, number, date, choice, tick box), the title, status and due date columns are worked out for you; check and import up to 2,000 rows.
- Eleven ready-made trackers: weld log, bolt torque, cable pulls, pressure tests, calibration, equipment, receiving, lifting plans, concrete pours, plant pre-start checks and loop checks.
- Import more rows into a tracker later, matched to its fields by heading.
- Excel export for every register and tracker, with all its fields.
All documents in one list
- All documents: every document on the project in one searchable list, with controlled documents and drawings (latest revision), turnover documents, submittals, specifications, the knowledge library, shared files and record attachments.
- Search across number, title, type, discipline, status and company; filter by source, discipline, type and status; open the page or the file; export to Excel.
Engineering conversions
- A unit converter for length, area, volume, mass, force, pressure, temperature, flow, power, energy, torque, speed, density and viscosity, showing a value in every unit at once.
- Three- and single-phase power and current calculator.
- Reference tables: pipe NPS, DN, OD and Schedule 40/80 walls; AWG to mm² with the next metric size; metric bolt pitches and spanner sizes; inch fractions; IP ratings.
- Free on the website, and in the app from the calculator button at the top.
Turnover tracker: skylines, status and commissioning
- Skylines for MC, RFC, RFSU, handover and final acceptance: each subsystem in its planned week, coloured achieved, late, overdue, at risk or planned, with cumulative planned-vs-achieved lines.
- Turnover status: A, B and C check sheets, open punch items by category and every certificate's status, plan and sign-off date per subsystem, with Excel export.
- Commissioning tracker: B and C check sheets and commissioning activities by type for each subsystem, with RFSU status.
- Plan milestone dates per subsystem, or paste them from Excel or P6.
Time tracking and LEM sheets
- Timesheets: hours by cost code and activity each week, with overtime and billable flags, submitted for approval.
- Approvals for admins and inspectors, and a time report by person, cost code or day with Excel export.
- LEM sheets: daily labour, equipment and materials per contractor, priced from the project's rate card, with rostered crew added in one click.
- Submit, approve or reject; approved sheets lock and print to PDF with their sign-off. Export a month of sheets to Excel for invoicing.
To-dos, reminders and rosters
- My to-do: your own list across projects, with due dates, priorities and reminders by pop-up and email (with Done and Snooze).
- Roster: who is on site each day, on which shift. Paint shifts across the grid, paste people from Excel, and apply rotations such as 8/6, 14/14, 21/7 or 2-2-3 to a crew at once.
- Daily headcount on site (day and night) and CSV download for payroll and camp bookings.
Project calendar
- A calendar in every project with meetings, ITP inspections, surveillance, walkdowns, commissioning tests, deliveries, training and due dates from across the project.
- Plan walkdowns, inspections, FATs, deliveries, training and shutdowns, including events that last several days.
- Filter by type, see a whole day at once, and download the month as an .ics file for Outlook, Google or Apple calendars.
Messages, discussions, shared folders and tutorials
- Messages: a team chat for every project, plus direct and group messages with anyone you work with. Unread messages show at the top of the screen.
- Discussions on NCRs, technical queries, changes, documents, drawings, tags, check sheets, certificates, meetings, daily logs and specifications. Type @ to mention someone: they get a message with a link and an email.
- Files: shared project folders stored privately on Cloudflare R2, with upload, search, preview, move and undo.
- Notes: private or shared with the team, in colours, with pins.
- Learn: quick tutorials for every module and the whole platform, which open the right pages and point at what to click. The graduation-cap button on any project page plays the tutorial for that page.
Reports, trackers and sample documents
- Reports & trackers in every project: weekly progress report, punch list analysis, commissioning status report and management dashboard as PDF, and punch, document, submittal, action, commissioning and materials trackers as Excel, all built from live data.
- Sample projects now have real documents: drawings (P&IDs, single line diagrams, loop diagrams, layouts) with revisions and punch items pinned on them, specifications, procedures, datasheets, turnover documents and submittal files.
- Each sample's knowledge library has a scope of work, basis of design, execution plan, commissioning, quality and HSE plans, a punch procedure, reports and trackers.
- Show me around: a short tour in every sample project, with things to try for its industry.
- New help guides: exploring a sample project, reports and trackers, and the knowledge library.
Sample projects for your industry
- Explore a sample project now lets you pick a small data centre, a small LNG plant, a small mining plant or a water pump station, each with its own systems, companies, crews, tags, punch items, technical queries and changes.
- New sample project pages on the website show what's inside each one.
- Sample projects now fill every module: over 40 tag-linked punch items with history and a walkdown, daily logs, meetings, submittals and specifications, engineering schedules, permits and safety records, materials and purchase orders, commissioning activities, people and a training course.
- Fixed: the daily log month list showed 0 workers and 0 hours.
A sharper punch list
- Punch items link to tags: pick the tag as you type, and every tag's page lists its punch items.
- Name a responsible person as well as the company. They're emailed and see the item in My work.
- Photos of the fix: add them when marking an item ready, shown beside the issue photos.
- Days to fix per category (Setup → Categories): new items get a due date automatically.
- The list shows due dates and overdue items, with filters for overdue, tag, assigned to me, my company's and raised by me, and sorting by due date or category.
- A warning when a similar open punch already exists, so duplicates aren't raised.
- Raise similar: start a new punch with the same subsystem, company, tag and location.
- Each punch shows who it's waiting on, how long it's been open and how often it was sent back.
- Exports include the tag, responsible person and overdue flag; spreadsheet imports read the tag column.
- Every punch now has a discipline, and can be assigned to a group (set up in Setup → Punch list) as well as a company. Bulk actions set the discipline or group on many at once.
- The responsible person is now optional per project: admins switch it on or off in Setup → Punch list (off by default).
Field tools, revision control and undo
- Custom roles: build your own roles from the standard ones, with modules read only or hidden.
- Forms builder: design your own inspections, checklists and requests in Setup (AI can draft the fields), with their own numbering and workflow.
- Specifications: the spec book by section, with each section's required submittals found in its text and tracked to approval.
- Meetings: agenda, attendance, minutes drafted from your notes, PDF minutes, and actions that carry forward until done.
- Submittals & reviews: contractors submit redlines, weld maps, test packs and more; the client reviews on screen with comments pinned on the drawings, an AI pre-review and consistent checklists for every type.
- Daily logs: weather, crews, equipment, work done, delays and incidents, with photos and a PDF report.
- Drawings: open any drawing on your phone, zoom in and pin punch items, NCRs, queries and notes where they are.
- Photo album: every project photo in one place, filtered by source, subsystem or tag.
- Portfolio: every project you can see on one screen, with punches, quality, safety, documents and progress.
- Revision control for every document: the latest revision opens by default; older ones are one click away and clearly marked in red.
- Every change is logged. Undo a delete straight away, or restore it from Recently deleted for 30 days.
- Undo a punch status change you made by mistake.
- Search a whole project with Ctrl K (⌘K on Mac).
- Faster on big projects: lists load one page at a time, even with tens of thousands of tags.
- Mobile apps for iPhone and Android are coming soon. Until then, install SureCon from your phone's browser.
Easier to start, easier to share
- Bulk actions: tick punch items to assign a company, set a due date, mark ready or close them together.
- A help center with step-by-step guides, and a clearer sign-up and email verification.
- Explore a demo project: one click gives you a filled-in sample project to look around.
- A getting-started checklist on the projects page.
- Email notifications: items ready to verify, sent back, newly assigned, walkdown summaries and assigned records.
- Import an existing punch list from Excel or CSV.
- Share a read-only punch list with people who don't have an account.
- QR labels for tags: print them, stick them on the equipment, scan to open the tag.
- Send feedback from inside the app.
- Free templates: punch list, ITP, 37 check sheets, completion certificates, NCR and tag register.
- New feature pages, a completions glossary and comparisons.
Your own AI model, company teams and much more
- Settings → AI model: use the free built-in model or connect your own AI account.
- Company team: admins add people to every project in the company at once.
- Forgot password and reset password.
- Learning: courses with quizzes that issue certifications.
- Preventive maintenance that schedules its own next date.
- Admins can change any register's workflow without code.
- AI assistant and knowledge library: answers from your documents, with sources.
- Project dashboard and two-week crew planner.
- Engineering schedules with installation progress by discipline.
- Registers for issues, tasks, permits, LOTO, JSAs, materials and more, with My work.
- Preservation, technical queries and management of change.
Completions, quality and handover
- Tags, check sheets, deliverables and completion certificates from MC to final acceptance.
- Document control, ITPs, inspections, surveillance and NCRs.
- Switch modules on or off per project.
- Project dashboard, offline punch capture and an installable app.
- Export punch lists to PDF, Excel and CSV.
- Voice input for punch items and comments.