Skip to content

Security & data protection

Last updated

Construction records are commercially sensitive and often safety-critical. Here's how SureCon keeps them safe, and who can see what.

Your data belongs to you

  • Each organisation's projects are visible only to its team and the people invited to a project.
  • Roles (admin, inspector, contractor, viewer) decide what each person can see and do, and every request is checked on the server, not just hidden in the screen.
  • Contractors see and act on their own company's items where the workflow says so.

How it's protected

  • All traffic is encrypted in transit (HTTPS).
  • Data is stored with established cloud providers: Neon (database) and Cloudflare (hosting, files and AI processing).
  • Uploaded files are private and are only served to signed-in members of the project they belong to.
  • Passwords are handled by our sign-in provider and are never visible to us. Email addresses must be verified before invitations are accepted.
  • Requests that change data are protected against cross-site request forgery.
  • API keys you save for your own AI provider are encrypted before they're stored and never shown again.
  • Two-step codes and AI requests are rate-limited to slow down guessing and abuse.

Controls for your company

  • Two-step sign-in: anyone can turn on codes from an authenticator app, with one-time recovery codes. Companies can require it for everyone; members without it can't open the company's projects until they set it up.
  • Allowed networks: limit a company's projects to office, VPN or site networks (IPv4 and IPv6 ranges). Admins can't save a list that would lock themselves out.
  • Session length: ask everyone to sign in again after 8 hours up to 2 weeks.
  • Devices: see where you're signed in and sign out any device, or all others at once.
  • Activity log: owners and admins see every change across the company's projects, including changes to these settings.
  • Outside parties: links for people without an account show only their company's items, expire, can be revoked, and only a fingerprint of each link is stored.
  • E-signatures: the signer's email is confirmed with a one-time code, and each signature records consent, time, network address, device and a SHA-256 fingerprint of what was signed.
  • Roles and custom roles decide which modules each person can see or change, checked on the server for every request.

Where we are on certifications

SureCon doesn't hold SOC 2 or ISO 27001 certification yet. Our hosting and database providers (Cloudflare and Neon) do, for the infrastructure your data runs on. Single sign-on with your own identity provider (SAML) and choosing the region your data is stored in aren't available yet. If your company needs any of these, or a security questionnaire filled in, contact us.

AI and privacy

AI answers are built by looking up the documents you've switched on for AI, at the moment you ask. Your data isn't used to train AI models. Each person's AI conversations and the notes the assistant keeps about them are private to their account. Library groups and individual documents can be switched off for AI at any time.

Records and audit trail

Changes to punches, records, documents, NCRs and certificates are kept in each item's history, with who did what and when. Exports to PDF, Excel and CSV let you keep your own copies.

Reporting a security issue

If you think you've found a security problem, please contact us straight away with the details. Please don't access other people's data or disrupt the service while testing. We'll respond quickly and keep you updated.

Contact us

Questions or requests? Use our contact page.