Skip to content

Now in public beta · Ready to use · 100% free

Free construction completions software.
Finish strong. Hand over sure.

SureCon brings completions, quality, safety, progress and handover into one beautifully simple platform. Less chasing paperwork. More finishing the job. Free for every team, on every project.

  • No credit card
  • Unlimited users
  • Works offline on site

SureCon at a glance

modules in one place
40+
modules in one place
forever, for every team
$0
forever, for every team
disciplines tracked
8
disciplines tracked
source of truth
1
source of truth

What is SureCon?

SureCon is a free construction completions platform for the people who finish projects: completions and commissioning engineers, QA/QC inspectors, HSE and permit coordinators, site supervisors, subcontractors and the owners who accept the work.

It covers the stage where most delays happen — mechanical completion, punch-out, inspection and handover. Instead of tracking these in spreadsheets, paper binders and email threads, teams organise work by system and tag, raise and close punch items with photos from a phone, complete check sheets and walkdowns, manage permits and isolations, and follow progress on a live dashboard.

Because every record is linked to its system as the work happens, the handover dossier builds itself along the way, and field crews can keep working offline on site. SureCon is currently in public beta and free to use.

Why SureCon

The last 10 % shouldn't take 50 % of the time.

Projects don't slip at the finish line because the work is hard. They slip because the proof is scattered. SureCon brings it together.

Without SureCon

  • Punch lists in five versions of the same spreadsheet
  • Check sheets lost between site and office
  • Permits on clipboards nobody can find
  • Handover binders built the night before

With SureCon

  • One live punch list, raised from your phone
  • Every check sheet linked to its tag and system
  • Every permit and isolation on one screen
  • A handover record that builds itself as you work

Everything in one place

One platform. Every finishing trade.

Forty-plus modules that talk to each other, so a punch item, a permit and a check sheet on the same tag all tell one story.

Completions & handover

From the first check sheet to the signed handover certificate.

  • Tag register with system and subsystem breakdown
  • Check sheets picked automatically from your ITPs
  • MC, RFC, RFSU and handover certificates with sign-off chains
  • Punch lists with photos, categories and walkdowns
  • Preservation routines so equipment stays in spec

Quality

Prove it was built right, without the binder mountain.

  • Inspection and test plans with hold and witness points
  • Inspection requests, surveillance and findings
  • NCRs with dispositions, corrective action and close-out
  • Audits and lessons learned that the next project can find

Safety

Everyone goes home. Every permit, every isolation, tracked.

  • Permits to work for hot work, confined space, electrical and heights
  • Lock-out / tag-out with isolation points and verification
  • JSAs, FLHAs and risk assessments scored by likelihood × severity
  • Safety observations, near misses and incidents

Engineering & progress

Know exactly how much is built, by discipline, down to the metre.

  • Cable, raceway, piping, HVAC duct, equipment and instrument schedules
  • Weighted rules of credit: pulled, terminated, tested, and more
  • Progress by discipline, system and subsystem
  • Technical queries (TQ / RFI) and management of change

Documents

The right revision, in the right hands, every time.

  • Document control with revisions and review codes
  • Transmittals created for you
  • Redlines, scopes of work and SOPs
  • Tag numbers found in documents and linked automatically

Materials & procurement

No more “where is that pump?” phone calls.

  • Material take-offs and purchase orders
  • Vendor management
  • Material receiving and quantity surveys
  • Late deliveries flagged on the dashboard

People & training

The right crew, certified, in the right place.

  • Crew planner across the next two weeks
  • Certifications with expiry warnings
  • Courses with quizzes; passing issues the certificate
  • Training records kept for every person

Maintenance & commissioning

Hand over a plant that's ready to run, and keep it that way.

  • Commissioning activities from procedure to completion
  • Work orders for corrective maintenance
  • Preventive maintenance that schedules its own next date
  • Overdue maintenance on the dashboard

Project control

One screen that tells the whole story.

  • Live dashboard across every module
  • Issues, tasks, to-dos and a personal inbox
  • Zoom from the whole project down to a single tag
  • Workflows your admins can change without code

AI assistant

Your specs, procedures and past answers, one question away.

  • Ask questions and get answers with numbered sources
  • Draft TQ responses from earlier answers and specs
  • Make text concise, professional, or explain it simply
  • Edit check sheet templates by describing the change

From field work to construction handover

Completions

Watch every system climb to handover.

Tags, check sheets, punch items and certificates are linked to the system they belong to. Each milestone checks its own prerequisites, so nothing gets signed before it's truly ready.

  • Mechanical completion, RFC, RFSU and handover certificates
  • Check sheets created automatically from your ITPs
  • Progress by system and subsystem at a glance

In the field

Built for boots, not just desks.

Install SureCon on your phone like an app. Raise punch items with photos where you find them, dictate the description when your hands are full, and keep working when the signal drops.

  • Works offline: punches upload when you're back in range
  • Voice dictation fills in the details for you
  • Joint walkdowns with contractor, owner and commissioning

Safety

Every permit. Every isolation. Every time.

Permits to work, lock-out/tag-out, JSAs, FLHAs and risk assessments live together and link to the equipment they cover. Supervisors see everything that's live, right now.

  • Hot work, confined space, electrical and work at height
  • Isolation points applied, verified and removed, all on record
  • Observations, near misses and incidents on the dashboard

AI assistant

Your specs, answered in seconds.

Add specifications, codes and procedures to the knowledge library. Ask a question and SureCon answers from your own documents, with numbered sources you can check in a click.

  • Draft technical query responses from earlier answers
  • Make any text concise, professional, or plain English
  • Private to you, and never used to train AI models

Pricing

$0 / forever

100% free. No catch.

Great completions software shouldn't be reserved for the biggest projects. The subcontractor, the inspector and the safety officer deserve the same tools as head office. So SureCon is free, for everyone.

Why we made it free
  • Every module, including the AI assistant
  • Unlimited projects
  • Unlimited users and contractors
  • Mobile and offline use
  • Exports to PDF, Excel and CSV
  • No credit card, ever

How it works

Up and running before the next toolbox talk.

No consultants, no six-month rollout. If you can use a spreadsheet, you can run a project on SureCon.

  1. 1

    Create your project

    Name it, invite your team and contractors, and give everyone the right role: admin, inspector, contractor or viewer.

  2. 2

    Bring in your data

    Import systems, tags and schedules from the spreadsheets you already have. Load the standard check sheet library in one click.

  3. 3

    Run the work

    Raise punches from your phone, sign check sheets, issue permits, answer TQs and track progress. Everything is linked to the tag.

  4. 4

    Hand over with proof

    Watch systems climb from mechanical completion to handover, then hand over a complete, searchable record.

Use cases

Made for every kind of construction.

If your project has systems, tags and a handover, SureCon fits. Here's how teams across industries use it.

Oil & gas

Upstream facilities, refineries, LNG trains and pipelines. Systemised completions, preservation and permits built for hazardous sites.

How SureCon helps

Data centers

Electrical and mechanical systems that must work first time. Track every level of commissioning, every cable, every CRAH unit.

How SureCon helps

Mining & minerals

Processing plants, conveyors and remote camps. Offline punch capture, crew planning and certifications for fly-in, fly-out teams.

How SureCon helps

Commercial buildings

Offices, retail, hotels and mixed use. Snag lists, MEP progress and handover documents your client will actually read.

How SureCon helps

Power & renewables

Solar, wind, battery storage, substations and thermal plants. Cable schedules, LOTO and energisation in one record.

How SureCon helps

Infrastructure

Roads, bridges, rail, airports and ports. Inspections, NCRs and lessons learned across long, multi-contractor programmes.

How SureCon helps

Water & wastewater

Treatment plants and pumping stations. Instrument loops, preservation and preventive maintenance from day one.

How SureCon helps

Pharma & life sciences

Cleanrooms and process systems where documentation is everything. ITPs, review codes and a full audit trail.

How SureCon helps

Manufacturing & industrial

Factories, warehouses and production lines. Equipment set, aligned and handed over, with every vendor tracked.

How SureCon helps

Healthcare & public buildings

Hospitals, schools and civic buildings. Life-safety systems commissioned, inspected and proven before opening day.

How SureCon helps

…and everything in between

Marine and offshore, semiconductors, telecom, airports, residential towers, shutdowns and turnarounds. Different sites, same need: finish safely, prove the quality, hand over with confidence.

Project privacy and offline access

Your data is yours

Each project is visible only to the people you invite, with roles that decide who can do what.

Private AI

Your AI conversations and memory belong to your account alone. Nothing is used to train AI models.

Ready for remote sites

Install it on your phone, capture punches without signal, and sync when you're back in range.

FAQ

Questions, answered.

What is SureCon?

SureCon is one place to run the finishing stages of a construction project: completions, quality, safety, documents, procurement, people, maintenance and commissioning. It replaces the spreadsheets, email chains and paper binders that usually hold this information.

Is it really 100% free?

Yes. SureCon is free to use, with no credit card, no per-user fees and no limit on projects. We'd rather have every crew on site using it than a few paying for it.

When can I start using it?

Today. SureCon is in public beta: create a free account, set up your project and invite your team in a few minutes.

Who is it for?

Owners, EPC contractors, subcontractors, commissioning teams, QA/QC inspectors, safety officers and project managers. Each person gets a role, and sees and does what that role allows.

What kinds of projects does it support?

Any kind of construction: oil and gas, LNG, data centers, mining, power and renewables, commercial and public buildings, infrastructure, water, pharmaceuticals and manufacturing. If it has systems, tags and a handover, SureCon fits.

Can I try it before setting up my own project?

Yes. After you sign up, open a filled-in sample project in one click: a small data centre, a small LNG plant, a small mining plant or a water pump station, complete with punch lists, tags, check sheets, inspections and handover certificates.

Does it work on site without signal?

Yes. You can install SureCon on your phone like an app. Punches you raise without signal are saved on the device and upload when you're back online. You can even dictate them by voice.

Is there a mobile app?

Mobile apps for iPhone, iPad and Android are coming soon. You don't have to wait: SureCon already works in your phone's browser, and you can add it to your home screen so it opens like an app, works offline and takes photos.

Who owns my data?

You do. Each project's data belongs to that project and is only visible to the people you invite. Your AI conversations and the things the assistant remembers are private to you, and are never used to train AI models.

How does the AI assistant work?

Add your specifications, procedures and codes to the project's knowledge library and switch them on for AI. When you ask a question, SureCon looks up the relevant passages and answers with numbered sources, so you can check every claim.

More questions? See all answers in the help center.

Coming soon

SureCon apps for iPhone, iPad and Android

Native apps are on the way. You don't have to wait: SureCon already works in your phone's browser. Add it to your home screen and it opens like an app, takes photos and keeps working without signal.

  • Coming sooniPhone & iPad
  • Coming soonAndroid

Public beta · Open now

Be first on site.

SureCon is open and free to use today. Create your account and bring your whole team, or leave your email to hear about new features as they land.

Or get product news by email

Free forever · No credit card · Unlimited users · Follow SureCon news