All industries
Oil & gas
Completions software for oil, gas and LNG projects
From upstream facilities to refineries and LNG trains, thousands of tags have to be proven, preserved and handed over system by system, safely. SureCon keeps every check sheet, punch item, permit and certificate in one record.

The challenges
Systemised handover
Hundreds of subsystems, each needing its own MC, RFC and RFSU evidence.
Hazardous work
Hot work, confined space and live process systems demand tight permit and isolation control.
Long preservation periods
Rotating equipment can wait a year between delivery and start-up.
How SureCon helps
- System completionTags, check sheets, punches and certificates rolled up by system and subsystem.
- Permits & LOTOPermits to work linked to isolation points, JSAs and risk assessments.
- PreservationRoutines per tag with due dates, so warranties stay valid.
- Engineering progressCable, piping and instrument schedules with weighted rules of credit.
- AI on your specsAsk the project specifications and earlier TQ answers, with sources.
Try it with sample data
Open a filled-in small lng plant project
A small-scale LNG plant: pre-treatment, liquefaction, storage and truck loading, handed over system by system. Free, in one click after you sign up.
Typical systems we track
- Process trains
- Utilities and flare
- Fire and gas
- Instrument air
- Power generation and distribution
- Control and safety systems


