Skip to content
All articles

Safety

Permits, LOTO and JSAs: running site safety from one screen

Paper permits get lost, isolations get forgotten and JSAs get copied. A digital safety system that links them together keeps people safe and audits easy.

· 5 min read

Share
Illustration of a permit to work with lock-out tag-out isolation points

Most serious incidents in the finishing stages of a project share a pattern: work started on equipment that wasn't properly isolated, by a crew that didn't know what the other crew was doing.

Connect the safety paperwork

  • Permit to work: what work, where, when, and who authorised it. Hot work, confined space, electrical, work at height.
  • Lock-out / tag-out: every isolation point, who applied it, who verified it, and when it's removed.
  • Job safety analysis: the steps of the job, the hazards of each, and the controls.
  • Field-level hazard assessment: the quick check the crew does at the work face before starting.
  • Risk assessment: likelihood × severity, with mitigation and an owner.

What changes when it's digital

In SureCon each of these is a register with its own workflow: requested, approved, active, closed. Each record is linked to the tag and subsystem it affects. Supervisors see every live permit and isolation on one screen. Safety observations and incidents feed the dashboard, and nothing depends on a clipboard in the site office.

A hot work permit with its isolation points, JSA and risk score in one record.

Your procedures are different? Admins can change the statuses, the approval steps and who may take them, and add their own fields, without code.

Try it on your next project. It's free.

SureCon is in public beta and free for every team. Set up your first project in minutes.

Start for free