Features
Construction completions software features: punch lists to handover
Completions, quality, safety, progress and documents, connected by the same tags and subsystems. Every feature is free, for every member of your team.
Punch lists
Raise punch items with photos and voice, assign them to the right company, verify and close them, and export PDF, Excel or CSV reports. Free, works offline.
Explore Punch listsCheck sheets (ITRs)
A, B and C check sheets generated for every tag, filled in on site with pass/fail/N/A and readings checked against limits, then signed and verified. Free.
Explore Check sheets (ITRs)Completion & handover
MC, RFC, RFSU, handover and final acceptance certificates calculated from check sheets, punches, NCRs and deliverables, with sign-off chains and PDF turnover packages.
Explore Completion & handoverITPs & inspections
Build ITPs per discipline with hold, witness, review and surveillance points, request inspections, record results and link every step to its check sheet. Free.
Explore ITPs & inspectionsNCRs
Raise NCRs from site or from a surveillance finding, agree the disposition, record root cause and corrective action, verify and close. Open NCRs block completion. Free.
Explore NCRsPermits & LOTO
Digital permits to work for hot work, confined space, electrical and work at height, linked to lock-out/tag-out, JSAs and risk assessments. Free for every crew.
Explore Permits & LOTOProgress tracking
Import cable, raceway, piping, HVAC, equipment and instrument schedules and report progress with weighted rules of credit, by discipline, system and subsystem. Free.
Explore Progress trackingDocument control
Controlled documents with revisions and review codes, transmittals with due dates, and the deliverables contractors owe for handover, all linked to tags. Free.
Explore Document controlPreservation
Recurring preservation routines per tag, such as shaft rotation, heaters, desiccant and covers, with due dates, issues recorded and overdue routines flagged. Free.
Explore PreservationTQs, RFIs & MOC
Raise technical queries (TQ / RFI) to engineering, draft answers with AI from earlier answers and specs, and run management of change with impacts and approvals. Free.
Explore TQs, RFIs & MOCAI assistant
Ask questions across your project's specifications, procedures and earlier answers and get replies with numbered sources. Draft TQ answers and tidy text with AI. Free.
Explore AI assistantField app & walkdowns
Install SureCon on any phone, run walkdowns, raise punch items with photos offline and fill check sheets on site. Everything uploads when you're back in range. Free.
Explore Field app & walkdownsProject dashboard
Live KPIs from every module, overdue work, workload per person and a per-subsystem table, plus My work lists for each person and a crew planner. Free.
Explore Project dashboardSee how these records work together in our construction completions software guide.
All of it, free.
No per-user fees, no paid tiers, no credit card. Switch off the modules you don't need, per project.
Start for free