Skip to content
All features

Completion & handover

Mechanical completion and handover, worked out from your records

SureCon works out each subsystem's readiness for every certificate, from mechanical completion to final acceptance, using the records you already keep. When the checks are green, the sign-off chain signs in order and SureCon builds the turnover package as a PDF.

Free forever · No credit card · Unlimited users

What you get

Readiness at a glance

Each certificate lists its checks: sheets per phase, deliverables accepted, open punches and NCRs.

Five certificates

Mechanical completion, ready for commissioning, ready for start-up, handover to operations and final acceptance.

Sign-off chains

Construction, completions, commissioning, operations and client sign in order. Once signed, it stays signed.

Turnover package

One click builds a PDF with the certificate, signatures, asset register, check sheets, deliverables, inspections, NCRs and drawings.

Stage per subsystem

See every subsystem's stage, from construction to accepted by client, in one matrix.

Deliverables tracked

Manuals, certificates, test records, spares lists and warranties owed by contractors and vendors.

How it works

  1. 1

    Set up systems

    Add systems and subsystems, then import tags.

  2. 2

    Work the records

    Check sheets, punches, NCRs and deliverables move forward on site.

  3. 3

    Check readiness

    Each certificate shows what's still missing.

  4. 4

    Sign & package

    Sign in order and download the turnover package.

Questions

What is mechanical completion?

Mechanical completion (MC) is the point where a system is installed and tested to design, with construction check sheets complete and no top-category punch items open. It's the first step towards commissioning and handover.

What's the difference between RFC and RFSU?

Ready for commissioning (RFC) means pre-commissioning is complete and the system can be commissioned. Ready for start-up (RFSU) means commissioning is done and safety systems are confirmed, so the system can start up.

Can I change the sign-off chain?

The standard library defines who signs each certificate. Contact us if your contract needs a different chain.