What is ready for start-up (RFSU)?
Ready for start-up (RFSU) means a system is commissioned, its safety systems are tested and it's ready to receive process fluids or be energised for operation.
RFSU follows commissioning, which is recorded on C check sheets: functional tests, solo runs and loop function tests. Safety systems, such as fire and gas detection and emergency shutdown, must be proven before RFSU.
It's often the moment operations begin to take part in sign-offs, before full handover to operations.