Skip to content
Glossary

What is ready for commissioning (RFC)?

Ready for commissioning (RFC) means a subsystem has passed its pre-commissioning tests and is safe to start commissioning.

After mechanical completion, pre-commissioning tests such as insulation resistance, loop checks, flushing and alignment are recorded on B check sheets. When they're complete, the RFC certificate is signed.

RFC is usually signed by the completions lead and the commissioning lead, and it needs the MC certificate to be signed first.