Free tool
Engineering unit conversions and reference tables for site
Pressure, flow, torque, power and temperature in a click, plus the pipe, wire, bolt and IP tables you reach for every day on site.
Unit converter
Length, area, volume, mass, force, pressure, temperature, flow, power, energy, torque, speed, density and viscosity.
1 bar = 14.5038 psi (lbf/in²)
| Unit | 1 bar is |
|---|---|
| pascal (Pa) | 100,000 |
| kilopascal (kPa) | 100 |
| megapascal (MPa) | 0.1 |
| millibar (mbar) | 1,000 |
| bar | 1 |
| psi (lbf/in²) | 14.5038 |
| ksi | 0.0145038 |
| standard atmosphere (atm) | 0.986923 |
| kgf/cm² | 1.01972 |
| mmHg | 750.062 |
| inch of water (inH₂O, conventional) | 401.463 |
| metre of water (mH₂O, conventional) | 10.1972 |
Power and current
Three-phase: P = √3 × V × I × PF, with V the line-to-line voltage.
100 A at 400 V → 58.8897 kW, 69.282 kVA
55 kW at 400 V → 93.3949 A
Pipe sizes (NPS, DN, OD and wall thickness)
Steel pipe to ASME B36.10M. Wall thicknesses for Schedule 40 and 80.
| NPS (in) | DN | OD (in) | OD (mm) | Sch 40 wall (in / mm) | Sch 80 wall (in / mm) |
|---|---|---|---|---|---|
| 1/8 | 6 | 0.405 | 10.3 | 0.068 / 1.73 | 0.095 / 2.41 |
| 1/4 | 8 | 0.540 | 13.7 | 0.088 / 2.24 | 0.119 / 3.02 |
| 3/8 | 10 | 0.675 | 17.1 | 0.091 / 2.31 | 0.126 / 3.20 |
| 1/2 | 15 | 0.840 | 21.3 | 0.109 / 2.77 | 0.147 / 3.73 |
| 3/4 | 20 | 1.050 | 26.7 | 0.113 / 2.87 | 0.154 / 3.91 |
| 1 | 25 | 1.315 | 33.4 | 0.133 / 3.38 | 0.179 / 4.55 |
| 1 1/4 | 32 | 1.660 | 42.2 | 0.140 / 3.56 | 0.191 / 4.85 |
| 1 1/2 | 40 | 1.900 | 48.3 | 0.145 / 3.68 | 0.200 / 5.08 |
| 2 | 50 | 2.375 | 60.3 | 0.154 / 3.91 | 0.218 / 5.54 |
| 2 1/2 | 65 | 2.875 | 73.0 | 0.203 / 5.16 | 0.276 / 7.01 |
| 3 | 80 | 3.500 | 88.9 | 0.216 / 5.49 | 0.300 / 7.62 |
| 4 | 100 | 4.500 | 114.3 | 0.237 / 6.02 | 0.337 / 8.56 |
| 5 | 125 | 5.563 | 141.3 | 0.258 / 6.55 | 0.375 / 9.52 |
| 6 | 150 | 6.625 | 168.3 | 0.280 / 7.11 | 0.432 / 10.97 |
| 8 | 200 | 8.625 | 219.1 | 0.322 / 8.18 | 0.500 / 12.70 |
| 10 | 250 | 10.750 | 273.1 | 0.365 / 9.27 | 0.594 / 15.09 |
| 12 | 300 | 12.750 | 323.8 | 0.406 / 10.31 | 0.688 / 17.48 |
| 14 | 350 | 14.000 | 355.6 | 0.438 / 11.13 | 0.750 / 19.05 |
| 16 | 400 | 16.000 | 406.4 | 0.500 / 12.70 | 0.844 / 21.44 |
| 18 | 450 | 18.000 | 457.2 | 0.562 / 14.27 | 0.938 / 23.83 |
| 20 | 500 | 20.000 | 508.0 | 0.594 / 15.09 | 1.031 / 26.19 |
| 24 | 600 | 24.000 | 609.6 | 0.688 / 17.48 | 1.219 / 30.96 |
Wire sizes (AWG to mm²)
American Wire Gauge diameter and cross-section from the defining formula, with the next IEC 60228 metric size up.
| AWG | Diameter (mm) | Area (mm²) | Next metric size (mm²) |
|---|---|---|---|
| 4/0 | 11.684 | 107.22 | 120 |
| 3/0 | 10.405 | 85.03 | 95 |
| 2/0 | 9.266 | 67.43 | 70 |
| 1/0 | 8.251 | 53.48 | 70 |
| 1 | 7.348 | 42.41 | 50 |
| 2 | 6.544 | 33.63 | 35 |
| 3 | 5.827 | 26.67 | 35 |
| 4 | 5.189 | 21.15 | 25 |
| 6 | 4.115 | 13.30 | 16 |
| 8 | 3.264 | 8.37 | 10 |
| 10 | 2.588 | 5.26 | 6 |
| 12 | 2.053 | 3.31 | 4 |
| 14 | 1.628 | 2.08 | 2.5 |
| 16 | 1.291 | 1.31 | 1.5 |
| 18 | 1.024 | 0.82 | 1 |
| 20 | 0.812 | 0.52 | 0.75 |
| 22 | 0.644 | 0.33 | 0.5 |
| 24 | 0.511 | 0.20 | 0.5 |
Metric bolts: pitch and spanner size
ISO metric coarse threads, with the hex width across flats (ISO 4032 / 4014). Some DIN sizes differ: M10 17 mm, M12 19 mm.
| Size | Coarse pitch (mm) | Spanner / socket (mm) |
|---|---|---|
| M6 | 1 | 10 |
| M8 | 1.25 | 13 |
| M10 | 1.5 | 16 |
| M12 | 1.75 | 18 |
| M16 | 2 | 24 |
| M20 | 2.5 | 30 |
| M24 | 3 | 36 |
| M30 | 3.5 | 46 |
| M36 | 4 | 55 |
Inch fractions to millimetres
| Inches | Decimal (in) | Millimetres |
|---|---|---|
| 1/16 | 0.0625 | 1.587 |
| 1/8 | 0.1250 | 3.175 |
| 3/16 | 0.1875 | 4.762 |
| 1/4 | 0.2500 | 6.350 |
| 5/16 | 0.3125 | 7.938 |
| 3/8 | 0.3750 | 9.525 |
| 7/16 | 0.4375 | 11.112 |
| 1/2 | 0.5000 | 12.700 |
| 9/16 | 0.5625 | 14.287 |
| 5/8 | 0.6250 | 15.875 |
| 11/16 | 0.6875 | 17.462 |
| 3/4 | 0.7500 | 19.050 |
| 13/16 | 0.8125 | 20.637 |
| 7/8 | 0.8750 | 22.225 |
| 15/16 | 0.9375 | 23.813 |
| 1 | 1.0000 | 25.400 |
IP ratings (IEC 60529)
IP + two digits: the first for solids and dust, the second for water. IP66 = dust tight and protected against powerful water jets.
| First digit | Protected against |
|---|---|
| 0 | No protection |
| 1 | Objects over 50 mm (back of a hand) |
| 2 | Objects over 12.5 mm (fingers) |
| 3 | Objects over 2.5 mm (tools, thick wires) |
| 4 | Objects over 1 mm (most wires, screws) |
| 5 | Dust protected (some ingress, no harm) |
| 6 | Dust tight |
| Second digit | Protected against |
|---|---|
| 0 | No protection |
| 1 | Vertically dripping water |
| 2 | Dripping water, enclosure tilted up to 15° |
| 3 | Spraying water, up to 60° from vertical |
| 4 | Splashing water from any direction |
| 5 | Water jets (6.3 mm nozzle) |
| 6 | Powerful water jets (12.5 mm nozzle) |
| 7 | Temporary immersion, up to 1 m for 30 minutes |
| 8 | Continuous immersion beyond 1 m (as the maker states) |
| 9K | High-pressure, high-temperature water jets |
Conversion factors are exact where the unit is defined exactly (inch, foot, pound, gallon, barrel) and to at least 9 significant figures otherwise. Check reference tables against the current standard before using them for design.
Run your whole project in one place
SureCon keeps punch lists, check sheets, turnover, documents, rosters, timesheets and LEM sheets together, free. These conversions are built in too.
Start free