Free templates
Free construction completion templates: punch list, ITP, check sheets and NCR
The same punch list, ITP, check sheets, certificates and NCR forms SureCon uses, as Excel and CSV files. No sign-up, no email needed.
Completions manager's checklist
A printable checklist for construction completions managers, phase by phase: setup, construction, mechanical completion, commissioning and handover.
Preview & download PDFCommissioning readiness checklist
A printable checklist of what must be true before a system is energised, flushed or started: construction, testing, documents, safety and people.
Preview & download ExcelPunch list template
Download a free construction punch list template in Excel, with A/B/C categories, responsible company, status and verification columns. Ready to print or share.
Preview & download ExcelInspection and test plan (ITP) template
Free ITP template in Excel with hold, witness, review and surveillance points for contractor, owner and third party, plus a worked electrical example.
Preview & download ExcelCheck sheet (ITR) templates
37 free check sheet (ITR) templates for construction, pre-commissioning and commissioning: pumps, motors, cables, instruments, valves, HVAC, structural and more.
Preview & download ExcelCompletion certificate templates (MC to FAC)
Free mechanical completion, ready for commissioning, ready for start-up, handover and final acceptance certificate templates with readiness checks and sign-offs.
Preview & download ExcelNCR form and register
Free nonconformance report (NCR) form and register in Excel: description, disposition, root cause, corrective and preventive action, verification and close-out.
Preview & download CSVTag register template (CSV)
Free tag register / asset register template in CSV, with the columns SureCon imports: tag, type, subsystem, discipline, loop, range, signal, I/O, P&ID and more.
Preview & downloadOutgrowing the spreadsheet?
SureCon does all of this on a phone, with photos, sign-offs and live progress, and creates the check sheets for every tag automatically. It's free too.
Start for free