Free Excel template
Punch list template
A clean punch list layout used on industrial and building projects: one row per defect, with the tag, category, responsible company, due date and who verified it. Use it as is, or move to SureCon when the spreadsheet starts getting out of hand.
No sign-up or email needed.
Preview
First of 2 sheets: Punch list, Categories
Punch list
- Project
- System / subsystem
- Walkdown date
- Inspector
| No. | Date raised | Tag | Subsystem | Location | Discipline | Category (A/B/C) | Description | Raised by | Responsible company | Due date | Status | Date closed | Verified by | Comments |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 2026-11-03 | P-1001A | 10-01 | Pump bay, north | Mechanical | A | Missing anchor bolt on base plate, north-east corner (example: delete this row) | J. Smith | Apex Mechanical | 2026-11-10 | Open | |||
| 2 | 2026-11-03 | JB-104 | 10-02 | Pipe rack, level 2 | Electrical | B | Cable gland missing on junction box entry 3 (example: delete this row) | J. Smith | Volt Electrical | 2026-11-17 | Ready for verification | Fixed 2026-11-08 | ||
| 3 | 2026-11-04 | HV-2003 | 20-01 | Unit 20 | Architectural | C | Paint touch-up on handrail (example: delete this row) | A. Lee | Coastal Painting | Closed | 2026-11-12 | A. Lee |
+ 47 more rows in the file
What's inside
- Punch list sheet with 15 columns and 50 numbered rows
- Three example items showing each status (delete them)
- Categories sheet explaining A / B / C
- Header block for project, subsystem, walkdown date and inspector
How to use it
- 1Fill in the header for the walkdown or area.
- 2Raise one row per defect with the exact tag and a category.
- 3Send each company its items, and set due dates.
- 4Close items only after an inspector has checked them on site.
Questions
What should a construction punch list include?
At least: a number, the tag or location, a clear description, the category, the responsible company, a due date, the status and who verified it. Photos help a lot, which is where a spreadsheet struggles.
What do punch categories A, B and C mean?
Category A items affect safety or function and must be closed before mechanical completion; B items before handover; C items are minor and can be closed after handover. Agree the exact meanings with your client.
Can I import this into SureCon?
SureCon creates punch items on site with photos, so most teams start fresh there. Contact us if you need an existing list moved across.
Punch list software that gets items closed
Same layout, but on a phone, with photos, sign-offs and live progress for the whole team. Free, with unlimited users.