Punch list template

A clean punch list layout used on industrial and building projects: one row per defect, with the tag, category, responsible company, due date and who verified it. Use it as is, or move to SureCon when the spreadsheet starts getting out of hand.

No sign-up or email needed.

Preview

First of 2 sheets: Punch list, Categories

Punch list

Project
System / subsystem
Walkdown date
Inspector
No.Date raisedTagSubsystemLocationDisciplineCategory (A/B/C)DescriptionRaised byResponsible companyDue dateStatusDate closedVerified byComments
12026-11-03P-1001A10-01Pump bay, northMechanicalAMissing anchor bolt on base plate, north-east corner (example: delete this row)J. SmithApex Mechanical2026-11-10Open
22026-11-03JB-10410-02Pipe rack, level 2ElectricalBCable gland missing on junction box entry 3 (example: delete this row)J. SmithVolt Electrical2026-11-17Ready for verificationFixed 2026-11-08
32026-11-04HV-200320-01Unit 20ArchitecturalCPaint touch-up on handrail (example: delete this row)A. LeeCoastal PaintingClosed2026-11-12A. Lee

+ 47 more rows in the file

What's inside

  • Punch list sheet with 15 columns and 50 numbered rows
  • Three example items showing each status (delete them)
  • Categories sheet explaining A / B / C
  • Header block for project, subsystem, walkdown date and inspector

How to use it

  1. 1Fill in the header for the walkdown or area.
  2. 2Raise one row per defect with the exact tag and a category.
  3. 3Send each company its items, and set due dates.
  4. 4Close items only after an inspector has checked them on site.

Questions

What should a construction punch list include?

At least: a number, the tag or location, a clear description, the category, the responsible company, a due date, the status and who verified it. Photos help a lot, which is where a spreadsheet struggles.

What do punch categories A, B and C mean?

Category A items affect safety or function and must be closed before mechanical completion; B items before handover; C items are minor and can be closed after handover. Agree the exact meanings with your client.

Can I import this into SureCon?

SureCon creates punch items on site with photos, so most teams start fresh there. Contact us if you need an existing list moved across.