Skip to content
All features

Punch lists

Punch list software that gets items closed

Raise a punch item in seconds on your phone, with photos and the exact tag. The right company sees it straight away, marks it ready, and an inspector verifies and closes it. Everyone works from the same live list instead of a spreadsheet passed around by email.

Free forever · No credit card · Unlimited users

What you get

Fast on site

Photos, category, discipline and company in a few taps, or just say it: voice input fills in the form for you.

Works without signal

Punches raised offline are saved on the phone with their photos and upload when you're back in range.

Clear responsibility

Each punch belongs to one company. Contractors see their own items and mark them ready for verification.

A / B / C categories

Use A/B/C or 1–4, with your own meanings. The dashboard shows how many top-category items still block completion.

Walkdowns

Walk a subsystem, raise items quickly with your choices remembered, and see what's already open there.

Reports in one click

Export a PDF report with photos, or Excel and CSV with a link back to every punch.

How it works

  1. 1

    Raise

    An inspector raises the item with photos, tag and category.

  2. 2

    Fix

    The responsible company fixes it and marks it ready for verification.

  3. 3

    Verify

    The inspector checks it on site and closes it, or rejects it with a comment.

  4. 4

    Hand over

    Open items roll up by subsystem, so you know what blocks each certificate.

Questions

What is a punch list in construction?

A punch list is the list of defects and unfinished work found during inspections near the end of construction. Each item must be fixed and verified before the system or building is handed over.

Can subcontractors use it without paying?

Yes. SureCon is free for everyone, with unlimited users. Invite each contractor and they only see and act on what's theirs.

Does it work offline?

Yes. You can raise punch items with photos with no signal; they upload automatically when the connection returns.

Can I import my existing punch list?

You can import your tag register from CSV today. Contact us if you'd like help moving an existing punch list across.

Still on spreadsheets? Free templates