Document control, transmittals and turnover deliverables

Keep drawings, specifications, procedures and datasheets under control: every revision from IFR to as-built, review codes, transmittals in and out, and the deliverables contractors and vendors owe for handover. Each document is linked to the tags and subsystems it covers.

Free forever · No credit card · Unlimited users

What you get

Revisions & review codes

IFR → IFA → IFC → as-built, with review codes 1–4 and a review form.

Transmittals

Incoming and outgoing transmittals with response due dates.

Turnover deliverables

Manuals, certificates, test records, spares lists and warranties, submitted and accepted.

Tags found for you

"Find tags in file" reads a document and links every tag it mentions.

Files up to 50 MB

Contractors submit revisions and deliverables; document control accepts or rejects them.

Into the package

Accepted deliverables and drawings go into the turnover package automatically.

How it works

  1. 1

    Register

    Add controlled documents and their tags.

  2. 2

    Review

    Contractors submit; reviewers code and comment.

  3. 3

    Transmit

    Issue transmittals and track responses.

  4. 4

    Turn over

    Deliverables are accepted and packaged with each certificate.

Questions

What does IFR, IFA and IFC mean?

Issued for review, issued for approval and issued for construction: the usual stages a drawing goes through before it's built, followed by as-built once construction is complete.

Can contractors upload their own documents?

Yes. Contractors submit document revisions and deliverables; document control reviews and accepts or rejects them.

Can AI read our documents?

Only if you switch a document on for AI in the knowledge library. Answers are built from those documents at question time; nothing is used to train models.