NCRs

Nonconformance reports from finding to close-out

An NCR in SureCon follows six clear steps, from open to closed, with the disposition, root cause, corrective and preventive action and full history in one record. Major and critical NCRs automatically block mechanical completion, so nothing slips through to handover.

Free forever · No credit card · Unlimited users

What you get

Six clear steps

Open → disposition proposed → disposition approved → corrective action → verified → closed.

Contractors take part

The responsible company proposes the disposition and records corrective action on its own NCRs.

Root cause & prevention

Record the cause and preventive action, so the same problem doesn't come back on the next project.

Blocks completion

Open major or critical NCRs block mechanical completion; every NCR must close before final acceptance.

From surveillance

Turn a surveillance finding into an NCR without retyping it.

Linked to tags

Each tag page lists its NCRs, alongside inspections and punches.

How it works

  1. 1

    Raise

    Describe the nonconformance and link the tag or subsystem.

  2. 2

    Disposition

    The contractor proposes; quality approves.

  3. 3

    Correct

    Corrective and preventive action is recorded.

  4. 4

    Verify & close

    Quality verifies on site and closes the NCR.

Questions

What is an NCR in construction?

A nonconformance report records work, material or equipment that doesn't meet the specification, and how it will be dealt with: use as is, repair, rework or reject.

Who can close an NCR?

Admins and inspectors approve dispositions, verify corrective action and close NCRs. Contractors work on their own company's NCRs.

Can I export the NCR register?

The NCR register is included in each turnover package PDF.