NCRs
Nonconformance reports from finding to close-out
An NCR in SureCon follows six clear steps, from open to closed, with the disposition, root cause, corrective and preventive action and full history in one record. Major and critical NCRs automatically block mechanical completion, so nothing slips through to handover.
Free forever · No credit card · Unlimited users
What you get
Six clear steps
Open → disposition proposed → disposition approved → corrective action → verified → closed.
Contractors take part
The responsible company proposes the disposition and records corrective action on its own NCRs.
Root cause & prevention
Record the cause and preventive action, so the same problem doesn't come back on the next project.
Blocks completion
Open major or critical NCRs block mechanical completion; every NCR must close before final acceptance.
From surveillance
Turn a surveillance finding into an NCR without retyping it.
Linked to tags
Each tag page lists its NCRs, alongside inspections and punches.
How it works
- 1
Raise
Describe the nonconformance and link the tag or subsystem.
- 2
Disposition
The contractor proposes; quality approves.
- 3
Correct
Corrective and preventive action is recorded.
- 4
Verify & close
Quality verifies on site and closes the NCR.
Questions
What is an NCR in construction?
A nonconformance report records work, material or equipment that doesn't meet the specification, and how it will be dealt with: use as is, repair, rework or reject.
Who can close an NCR?
Admins and inspectors approve dispositions, verify corrective action and close NCRs. Contractors work on their own company's NCRs.
Can I export the NCR register?
The NCR register is included in each turnover package PDF.