Skip to content
Glossary

What are as-built drawings?

As-built drawings show what was actually built, including changes made during construction, and are handed over to operations at the end of a project.

Changes are marked on site as redlines, then incorporated into the drawings by engineering. As-builts are usually required for handover or final acceptance.