Skip to content
Glossary

What is a turnover package?

A turnover package is the set of records handed over with a system: certificates, check sheets, punch lists, test records, NCRs, drawings and vendor documents.

Turnover packages prove a system was built and tested correctly. Assembling them by hand at the end of a project is slow, so it pays to collect records per subsystem as the work happens.