Completions for power and renewable energy projects

Solar, wind, battery storage, substations and thermal plants all end the same way: energisation. SureCon keeps cable schedules, isolations and test records ready for that moment.

Illustration of wind turbines, solar panels and a substation

The challenges

Energisation safety

Isolations and permits must be watertight before anything goes live.

Repetitive scope

Hundreds of identical strings, turbines or containers to prove one by one.

Spread-out sites

Large areas with crews far apart.

How SureCon helps

  • LOTO & permitsIsolation points applied, verified and removed, all on record.
  • Cable progressPulled, terminated and tested by the metre.
  • Check sheets from ITPsThe same checks for every string, turbine or bay, created automatically.
  • Offline field useRaise items on site, sync later.
  • CertificatesMechanical completion to handover, system by system.

Typical systems we track

  • PV strings and inverters
  • Wind turbines
  • BESS containers
  • Substations
  • Transformers
  • SCADA