Commissioning and handover for data centers
A data center is judged on uptime from day one. SureCon tracks every cable, CRAH unit and UPS through installation and the five commissioning levels, so integrated testing starts from a complete record.

The challenges
Speed to capacity
Halls are built and handed over in phases, on aggressive schedules.
Electrical density
Thousands of cables to pull, terminate and test, across several contractors.
Five commissioning levels
Issues found at level 5 often trace back to an unclosed level 2 item.
How SureCon helps
- Cable schedulesPulled, terminated and tested, by the metre, per hall and per system.
- Commissioning activitiesEach level and test tracked from procedure to completion.
- Punch listsRaised on site with photos, owned by the right contractor, verified before closing.
- DashboardsProgress by system, open punches and certificates on one screen.
- Maintenance handoverEquipment moves into preventive maintenance with its history.
Try it with sample data
Open a filled-in small data centre project
A 4 MW data hall: HV power, generators, UPS, chillers and CRAH units through Level 1–5 commissioning. Free, in one click after you sign up.
Typical systems we track
- Medium and low voltage
- UPS and batteries
- Generators
- Chilled water and CRAH
- Fire suppression
- BMS and EPMS