Small data centre: Harbour Edge DC1

A single-hall, 4 MW data centre in its final months. Power comes in through 11 kV switchgear and two transformers, backed by generators and dual UPS systems, with chillers and CRAH units cooling the hall. The punch list, check sheets and certificates show what still stands between each system and integrated systems testing.

Small data centre sample project in SureCon
systems
5
subsystems
10
punch items
12
companies
5

Systems and subsystems

  • 10 · HV & MV power

    • 10-01 11 kV incoming switchgear
    • 10-02 Transformers TX-1 / TX-2
  • 20 · Standby power

    • 20-01 Generators G1 / G2
    • 20-02 Generator fuel system
  • 30 · UPS & LV distribution

    • 30-01 UPS A / UPS B
    • 30-02 PDUs & busway, Data Hall 1
  • 40 · Cooling

    • 40-01 Chillers CH-01 / CH-02
    • 40-02 CRAH units, Data Hall 1
  • 50 · Fire protection & BMS

    • 50-01 Gas suppression
    • 50-02 BMS & EPMS

Companies and crews

  • Harbour Edge Data · client
  • Spark & Co Electrical · contractor
  • Polar Mechanical Services · contractor
  • Sentinel Fire Protection · subcontractor
  • CxPro Commissioning · other
  • Electrical crew
  • Mechanical crew
  • Commissioning agent
  • Client QA

Also inside

  • Over 40 punch items, most linked to tags, with history and a walkdown
  • Drawings (P&IDs, single line and loop diagrams, layouts) with punch items pinned on them
  • Specifications, procedures, datasheets and turnover documents as PDFs, with revisions
  • A library with the scope of work, basis of design, execution plan and project plans
  • Weekly report, punch analysis, commissioning status and management dashboard (PDF)
  • Punch, document, submittal, action, commissioning and materials trackers (Excel)
  • Tag register with technical data
  • Check sheets for construction, pre-commissioning and commissioning
  • ITPs, inspections and surveillance
  • NCRs with corrective actions
  • Technical queries and changes (MOC)
  • Preservation routines
  • Document register and transmittals
  • MC, RFC, RFSU and handover certificates
  • Daily logs with crews, equipment and weather
  • Meetings with minutes and open actions
  • Submittals under review, and the spec sections that need them
  • Cable, piping and equipment schedules with progress
  • Permits, LOTO, JSAs, risks and safety observations
  • Issues, tasks, materials, purchase orders and vendors
  • Commissioning activities, certifications and crews
  • A site induction course with a quiz

Punch items you'll find

Written the way site teams write them, each with a category, discipline, crew, company and due date.

CatIssueDisciplineCompanyStatus
AGenerator G2 tripped at 3 h 40 min of the 4-hour load bank test (fuel filter alarm)ElectricalSpark & Co ElectricalOpen
AUPS A battery string 3: two cells below float voltage toleranceElectricalSpark & Co ElectricalOpen
ACRAH-07 condensate drain not trapped, water on raised floor during testHVACPolar Mechanical ServicesReady to verify
BBusway tap-off box BTO-14 missing IP coverElectricalSpark & Co ElectricalOpen
BHot aisle containment door doesn't self-closeHVACPolar Mechanical ServicesOpen
BEPMS point list missing breaker status for MSB-2 feedersInstrumentationSpark & Co ElectricalReady to verify
ARoom integrity test failed: unsealed cable penetration in Data Hall 1 ceilingSafetySentinel Fire ProtectionOpen
BCable tray not earth bonded across expansion jointElectricalSpark & Co ElectricalClosed

Things to try

  1. 1Filter the punch list to category A items and see what still blocks IST.
  2. 2Open a generator or UPS tag and follow its check sheets from installation to functional test.
  3. 3Mark a punch item ready with a photo of the fix, then verify and close it.
  4. 4Check the commissioning dashboard: which subsystems are ready for energisation?

Ready in seconds, and free

Create a free account and the small data centre sample opens straight away. No credit card. Delete it whenever you like, then set up your own project.

How SureCon helps data centers projects →