Small mining plant: Red Hill Gold Processing Plant

A small gold processing plant on a remote site with fly-in, fly-out crews. Ore is crushed, ground in a SAG mill, leached in CIL tanks and the tailings thickened before disposal. The sample shows how SureCon keeps conveyors, mills, tanks and the HV substation moving from construction to dry and wet commissioning, with guarding and safety punch items front and centre.

Small mining plant sample project in SureCon
systems
5
subsystems
10
punch items
12
companies
4

Systems and subsystems

  • 10 · Crushing

    • 10-01 Primary jaw crusher
    • 10-02 Crushed ore conveyor CV-101
  • 20 · Grinding

    • 20-01 SAG mill
    • 20-02 Cyclone cluster & feed pumps
  • 30 · Leach & CIL

    • 30-01 CIL tanks 1–6
    • 30-02 Carbon handling
  • 40 · Tailings & water

    • 40-01 Tailings thickener
    • 40-02 Process water pumps
  • 50 · Power & controls

    • 50-01 HV substation
    • 50-02 Plant control system

Companies and crews

  • Red Hill Resources · client
  • Outback SMP Contractors · contractor
  • Ridge E&I · contractor
  • Conveyor Systems Co · subcontractor
  • SMP crew
  • E&I crew
  • Commissioning team
  • Client QA

Also inside

  • Over 40 punch items, most linked to tags, with history and a walkdown
  • Drawings (P&IDs, single line and loop diagrams, layouts) with punch items pinned on them
  • Specifications, procedures, datasheets and turnover documents as PDFs, with revisions
  • A library with the scope of work, basis of design, execution plan and project plans
  • Weekly report, punch analysis, commissioning status and management dashboard (PDF)
  • Punch, document, submittal, action, commissioning and materials trackers (Excel)
  • Tag register with technical data
  • Check sheets for construction, pre-commissioning and commissioning
  • ITPs, inspections and surveillance
  • NCRs with corrective actions
  • Technical queries and changes (MOC)
  • Preservation routines
  • Document register and transmittals
  • MC, RFC, RFSU and handover certificates
  • Daily logs with crews, equipment and weather
  • Meetings with minutes and open actions
  • Submittals under review, and the spec sections that need them
  • Cable, piping and equipment schedules with progress
  • Permits, LOTO, JSAs, risks and safety observations
  • Issues, tasks, materials, purchase orders and vendors
  • Commissioning activities, certifications and crews
  • A site induction course with a quiz

Punch items you'll find

Written the way site teams write them, each with a category, discipline, crew, company and due date.

CatIssueDisciplineCompanyStatus
APull-wire switch PW-12 on CV-101 doesn't trip the conveyorElectricalConveyor Systems CoOpen
AGuarding gap at SAG mill trommel more than 100 mmSafetyOutback SMP ContractorsOpen
AOil leak at mill lube system return lineMechanicalOutback SMP ContractorsReady to verify
AThickener rake overload trip not testedElectricalRidge E&IOpen
BBelt tracking off-centre at CV-101 tail pulleyMechanicalConveyor Systems CoOpen
BSeal water flow switch on cyclone feed pump P-2201B not wiredInstrumentationRidge E&IOpen
BBreather missing on CIL tank 3 agitator gearboxMechanicalOutback SMP ContractorsReady to verify
BGrating clips missing on CIL walkway, tanks 4–5Civil / StructuralOutback SMP ContractorsClosed

Things to try

  1. 1Filter the punch list by group to see what each crew still has to do before dry commissioning.
  2. 2Look at conveyor and mill tags and their check sheets.
  3. 3Run a walkdown on the crushing circuit and raise punch items with photos, even offline.
  4. 4Check the commissioning dashboard and see which areas are ready for ore.

Ready in seconds, and free

Create a free account and the small mining plant sample opens straight away. No credit card. Delete it whenever you like, then set up your own project.

How SureCon helps mining & minerals projects →