Skip to content
All sample projects

Sample project

Small LNG plant: Coral Bay Small-Scale LNG

A 0.3 MTPA small-scale LNG plant getting ready for start-up. Feed gas is metered and treated, liquefied in a mixed-refrigerant cold box, then stored and loaded onto trucks. The sample shows systemised completions: tags, check sheets and punch items rolled up into mechanical completion, ready for commissioning and ready for start-up certificates, with preservation on the rotating equipment.

Small LNG plant sample project in SureCon
systems
5
subsystems
10
punch items
12
companies
4

Systems and subsystems

  • 10 · Feed gas & pre-treatment

    • 10-01 Inlet metering & filtration
    • 10-02 Amine unit (CO2 removal)
  • 20 · Liquefaction

    • 20-01 Mixed refrigerant compressor
    • 20-02 Cold box & cryogenic exchanger
  • 30 · LNG storage & loading

    • 30-01 LNG storage tank
    • 30-02 Truck loading bays
  • 40 · Flare & safety systems

    • 40-01 Flare & knockout drum
    • 40-02 Fire & gas detection
  • 50 · Utilities

    • 50-01 Instrument air
    • 50-02 Power generation

Companies and crews

  • Coral Bay Energy · client
  • Meridian Process Contractors · contractor
  • Ironbark E&I · contractor
  • Cryo Insulation Services · subcontractor
  • Mechanical crew
  • E&I crew
  • Commissioning team
  • Client QA

Also inside

  • Over 40 punch items, most linked to tags, with history and a walkdown
  • Drawings (P&IDs, single line and loop diagrams, layouts) with punch items pinned on them
  • Specifications, procedures, datasheets and turnover documents as PDFs, with revisions
  • A library with the scope of work, basis of design, execution plan and project plans
  • Weekly report, punch analysis, commissioning status and management dashboard (PDF)
  • Punch, document, submittal, action, commissioning and materials trackers (Excel)
  • Tag register with technical data
  • Check sheets for construction, pre-commissioning and commissioning
  • ITPs, inspections and surveillance
  • NCRs with corrective actions
  • Technical queries and changes (MOC)
  • Preservation routines
  • Document register and transmittals
  • MC, RFC, RFSU and handover certificates
  • Daily logs with crews, equipment and weather
  • Meetings with minutes and open actions
  • Submittals under review, and the spec sections that need them
  • Cable, piping and equipment schedules with progress
  • Permits, LOTO, JSAs, risks and safety observations
  • Issues, tasks, materials, purchase orders and vendors
  • Commissioning activities, certifications and crews
  • A site induction course with a quiz

Punch items you'll find

Written the way site teams write them, each with a category, discipline, crew, company and due date.

CatIssueDisciplineCompanyStatus
APSV-4105 set pressure certificate not providedPipingMeridian Process ContractorsOpen
AVapour barrier damaged on cryogenic line 20-L-2214 insulationMechanicalCryo Insulation ServicesOpen
AMR compressor lube oil flushing record not signed offMechanicalMeridian Process ContractorsReady to verify
AGas detector GD-4012 doesn't cover loading bay 2 as shown on the F&G layoutInstrumentationIronbark E&IOpen
ALoading arm emergency release coupling test outstandingMechanicalMeridian Process ContractorsOpen
BStatic earthing clamp on bay 1 not proving earth to the interlockElectricalIronbark E&IReady to verify
BBolt torque record missing for flange on amine reboiler outletPipingMeridian Process ContractorsOpen
BHeat tracing HT-1102 insulation resistance below 20 MΩElectricalIronbark E&IOpen

Things to try

  1. 1See which subsystems are ready for mechanical completion and which punch items block RFSU.
  2. 2Open a pressure safety valve tag and check its datasheet and certificates.
  3. 3Look at preservation routines on the compressor and pumps, and what's overdue.
  4. 4Answer an open technical query and see it linked to the tag.

Ready in seconds, and free

Create a free account and the small lng plant sample opens straight away. No credit card. Delete it whenever you like, then set up your own project.

How SureCon helps oil & gas projects →