Sample project
Pump station: Northfield Pump Station
A small raw water pump station with two pump skids, an LV switchboard and a motor control centre. A quick way to see every SureCon module on a project you can take in at a glance.

- systems
- 2
- subsystems
- 4
- punch items
- 10
- companies
- 4
Systems and subsystems
10 · Raw water pumping
- 10-01 Pump skid A
- 10-02 Pump skid B
20 · Electrical distribution
- 20-01 LV switchboard
- 20-02 Motor control centre
Companies and crews
- Northfield Water · client
- Apex Mechanical · contractor
- Volt Electrical · contractor
- Coastal Painting · subcontractor
- Mechanical crew
- Electrical crew
Also inside
- Over 40 punch items, most linked to tags, with history and a walkdown
- Drawings (P&IDs, single line and loop diagrams, layouts) with punch items pinned on them
- Specifications, procedures, datasheets and turnover documents as PDFs, with revisions
- A library with the scope of work, basis of design, execution plan and project plans
- Weekly report, punch analysis, commissioning status and management dashboard (PDF)
- Punch, document, submittal, action, commissioning and materials trackers (Excel)
- Tag register with technical data
- Check sheets for construction, pre-commissioning and commissioning
- ITPs, inspections and surveillance
- NCRs with corrective actions
- Technical queries and changes (MOC)
- Preservation routines
- Document register and transmittals
- MC, RFC, RFSU and handover certificates
- Daily logs with crews, equipment and weather
- Meetings with minutes and open actions
- Submittals under review, and the spec sections that need them
- Cable, piping and equipment schedules with progress
- Permits, LOTO, JSAs, risks and safety observations
- Issues, tasks, materials, purchase orders and vendors
- Commissioning activities, certifications and crews
- A site induction course with a quiz
Punch items you'll find
Written the way site teams write them, each with a category, discipline, crew, company and due date.
| Cat | Issue | Discipline | Company | Status |
|---|---|---|---|---|
| A | Missing anchor bolt on P-1001A base plate | Mechanical | Apex Mechanical | Open |
| B | Pipe support PS-14 not welded to steel | Piping | Apex Mechanical | Ready to verify |
| C | Paint touch-up on handrail | Architectural | Coastal Painting | Open |
| A | Motor PM-1001B not earthed | Electrical | Volt Electrical | Ready to verify |
| B | Coupling guard missing on P-1001B | Mechanical | Apex Mechanical | Closed |
| A | Cable gland missing on SWB-01 entry 3 | Electrical | Volt Electrical | Open |
| B | Circuit labels missing on outgoing feeders | Electrical | Volt Electrical | Open |
| C | Scuffed door on MCC room | Architectural | Coastal Painting | Closed |
Things to try
- 1Raise a punch item by voice, with a photo.
- 2Mark an item ready, then verify and close it.
- 3Open the dashboard and see what blocks each certificate.
Ready in seconds, and free
Create a free account and the pump station sample opens straight away. No credit card. Delete it whenever you like, then set up your own project.
How SureCon helps water & wastewater projects →Other sample projects

Small data centre
A 4 MW data hall: HV power, generators, UPS, chillers and CRAH units through Level 1–5 commissioning.
10 subsystems · 12 punch items · tags, check sheets, ITPs, NCRs and certificates
See what's inside
Small LNG plant
A small-scale LNG plant: pre-treatment, liquefaction, storage and truck loading, handed over system by system.
10 subsystems · 12 punch items · tags, check sheets, ITPs, NCRs and certificates
See what's inside
Small mining plant
A 1.5 Mtpa gold plant: crushing, grinding, CIL leach, tailings and power, from construction to wet commissioning.
10 subsystems · 12 punch items · tags, check sheets, ITPs, NCRs and certificates
See what's inside