Quality & safety
Track welds, welders and NDE
See every joint's state, NDE result and test pack, and spot welders with high repair rates.
3 min

- 1
Open Weld maps
Turnover → Weld maps in the project menu. Welds are listed with line, joint, size, material, welder, NDE method and result.
- 2
Filter
Search by ISO, line, weld or welder, and filter by state, NDE result or test pack. 'Not in a pack' finds welds that would be missed at test pack time.
- 3
Record results
Update visual and NDE results as reports come in. Repaired or rejected joints stay visible so they're re-tested.
- 4
Watch repair rates
Welder repair rates shows each welder's welds, repairs and rate. A rising rate is an early warning to talk to the supervisor.