Use SureCon on site without signal

Install the app on your phone and raise items in basements, tunnels and remote sites.

3 min
  1. 1

    Install it

    Open surecon.com on your phone. iPhone: Share → Add to Home Screen. Android: menu → Install app. It opens like any app.

  2. 2

    Save a subsystem before you go

    With signal, open Check sheets or the ITR matrix, pick the subsystem and tap Save for offline. Its check sheets, test packs, weld map, preservation and punch list are kept on the device. Pages you've opened are kept too.

  3. 3

    Work offline

    Raise punch items with photos, fill in and sign check sheets, record weld results, tick test pack checks, record preservation and answer audit checklists. A button at the top shows how many changes are waiting.

  4. 4

    Back in range

    Everything is sent automatically, oldest first, or tap Upload now. Punch numbers are given on upload.

  5. 5

    If something is refused

    If the record changed meanwhile (say a sheet was signed by someone else), that change stays on the device with the reason. Open the record, check it, then discard the saved change.