Quality & safety
ITPs, inspections and NCRs
Plan inspections, record results and close out nonconformances.
6 min

- 1
Write and approve the ITP
Quality → ITPs. Add steps with references, acceptance criteria, the record each produces and hold / witness / review / surveillance points.
- 2
Request inspections
Quality → Inspections. Contractors request an inspection at each hold or witness point; inspectors record pass or fail.
- 3
Raise NCRs
Quality → NCRs, or from a surveillance finding. Describe the problem against the requirement it breaks and set the severity.
- 4
Close them out
The responsible company proposes a disposition, quality approves it, corrective action is recorded, verified on site and closed.