ITPs, inspections and NCRs

Plan inspections, record results and close out nonconformances.

6 min
The NCR register with open nonconformance reports
The NCR register with open nonconformance reports, in a sample project.
  1. 1

    Write and approve the ITP

    Quality → ITPs. Add steps with references, acceptance criteria, the record each produces and hold / witness / review / surveillance points.

  2. 2

    Request inspections

    Quality → Inspections. Contractors request an inspection at each hold or witness point; inspectors record pass or fail.

  3. 3

    Raise NCRs

    Quality → NCRs, or from a surveillance finding. Describe the problem against the requirement it breaks and set the severity.

  4. 4

    Close them out

    The responsible company proposes a disposition, quality approves it, corrective action is recorded, verified on site and closed.