Field work
Mark up drawings, outline systems and compare revisions
Clouds, notes and links on layers, system boundaries with their progress, and what changed between revisions.
- 1
Mark up
Open a drawing and tap Markup. Pick pen, cloud, box, arrow or text, a layer (Field markups, Engineering, Commissioning, As-built or your own) and a colour, then draw. Tick Only me to keep a markup to yourself.
- 2
Show or hide layers
Below the drawing, untick a layer to hide it, for example to print a clean sheet or see only commissioning notes.
- 3
Outline a system
With Markup on, pick System boundary, tap the corners of the area and Finish boundary, then pick the subsystem. Tap the outline later to see how many check sheets are done and how many punches are open.
- 4
Jump between sheets
Drawing numbers printed on a PDF (like reference drawings) are links: tap one to open that drawing. Use Link to drawing to add a link area by hand, for example on a match line.
- 5
Compare revisions
Pick a revision under Compare with…. Removed linework shows red, added blue and unchanged grey. Switch to either revision on its own to check a change.