Replace spreadsheets with trackers

Import a spreadsheet or pick a template to make a shared project database.

4 min Project admins create trackers. Admins and inspectors import rows. Everyone except viewers adds and updates records.
  1. 1

    Open Trackers

    Trackers is near the top of the project menu. Every tracker the project has is listed with how many records are open and overdue.

  2. 2

    Import a spreadsheet

    Import a spreadsheet (project admins) and pick an .xlsx or .csv file whose first row holds the headings. Each column becomes a field with its type worked out: text, number, date, choice list or tick box. A column called Status (Open, In progress, Done…) sets each record's status; a Due column sets due dates.

  3. 3

    Check and import

    Choose which column is the title (an ID, number or name), change any type, skip columns you don't need (up to 20 fields), name the tracker and its number prefix, then import up to 2,000 rows at a time.

  4. 4

    Or use a template

    Start from a weld log, bolt torque log, cable pull tracker, pressure test log, calibration register, equipment register, receiving log, lifting plan register, concrete pour log, pre-start checks or loop checks.

  5. 5

    Work on it together

    Everyone sees the same live list. Records have assignees, due dates, comments, attachments and history. Import rows adds more from a sheet later; Excel exports it any time.