Playbook: QA/QC inspector

How to work through inspections, check sheets and punches efficiently in the field.

4 min Inspectors, QC technicians and client witnesses.
  1. 1

    Before you go out

    Open My work for your inspections and hold points. Save the area for offline if signal is poor.

  2. 2

    At the equipment

    Open the tag, fill in the check sheet, take photos and sign. Readings outside limits are flagged as you type.

  3. 3

    Raise what you find

    Raise a punch for each defect with a photo and category, or an NCR when the work doesn't meet the specification.

  4. 4

    Verify and close

    Items marked ready by contractors appear as ready for verification. Check them on site and close or reject them.