Handover
Swap data with P6, Microsoft Project, Excel and COBie
Milestones to and from planning tools, Excel round-trips and a COBie handover workbook.
- 1
Export milestones to the schedule
Project → Integrations → Export milestones. The .xml opens in Microsoft Project and imports into Primavera P6, with every subsystem's MC, RFC, RFSU, handover and final acceptance dates (planned, and actual once signed).
- 2
Import planned dates
Import schedule takes a P6 .xer or Microsoft Project .xml. Activities are matched by subsystem code and milestone name ("10-01 Mechanical Completion", "RFSU 20-02"). Check the list, then Apply planned dates.
- 3
Edit in Excel and import back
Download workbook, change the Tags sheet (descriptions, types, areas, attributes or new tags) and the Plan sheet (planned dates), save, then Import workbook. Tags are matched by tag number.
- 4
COBie for the owner
Download COBie gives a COBie 2.4 workbook for the owner's maintenance system: areas as spaces, tag types with manufacturer and model, every tag as a component, subsystems as systems, documents and attributes.