Skip to content
Help center

Tools

Track, print and export check sheets (ITRs)

See ITR status by tag and subsystem, print sheets for work packs, verify in bulk and export the completions database.

4 min Everyone views and prints. Admins and inspectors verify.
The ITR matrix of tags against check sheets
The ITR matrix of tags against check sheets, in a sample project.
  1. 1

    Open the matrix

    Completions → ITR matrix. Filter by system, subsystem or phase (A construction, B pre-commissioning, C commissioning). Column heads show how many of each sheet type are done.

  2. 2

    Print work packs

    With a subsystem picked, Print sheets makes one PDF of its check sheets with results and sign-offs; Blank forms gives tick boxes and empty sign-off blocks for site. A single sheet prints from its own page with Print / PDF.

  3. 3

    Scan back in

    Each printed sheet carries a QR code. Scan it to open the sheet in SureCon and record the results, so the paper copy and the database stay the same.

  4. 4

    Verify in bulk

    Verify completed checks the sheets in the current filter that are completed and marks them verified with your name and today's date. Sheets not yet completed are left alone.

  5. 5

    Export

    Excel on the matrix exports it as shown. Export all on Check sheets, or Reports → Completions database, downloads the full completions data in one workbook.