Tools
Favourite documents, the current IFC and sharing links
Keep the documents you use at hand, always build from the current IFC, and share links, not copies.
- 1
Star what you use
In All documents, click the star next to a document, drawing, file or spec. Your favourites sit at the top of the page, and Favourites filters the list to them. Only you see your stars.
- 2
Build from the current IFC
Every controlled document and drawing shows whether its newest revision is issued for construction. When it isn't (a revision out for review, say), it shows the IFC revision to build from, and favourites open that one.
- 3
Warnings on the page
A document or drawing whose newest revision isn't IFC shows a warning with Show rev, which switches to the current IFC. Superseded revisions open stamped SUPERSEDED.
- 4
Share a link, not a file
Share link on a document, drawing, file or photo copies its link, or sends it to people on the project by message and email. The file stays in one place, so everyone opens the current copy and nothing is stored twice.
- 5
Photos in one place
Photos gathers every photo on the project: punch items, daily logs, uploads, and images in shared files and register attachments. Search by caption, tag or who took it, and open where each came from.