Handover-ready from day one: building the dossier as you go

The turnover dossier shouldn't be a project at the end. How to build it continuously so it's ready when the system is.

· 7 min read

Share
Illustration of a turnover dossier filling up over time alongside construction progress

On many projects, the system is finished in March and the dossier in June. Those three months cost money, delay final payment and frustrate the owner, who's running a plant without its records. It doesn't have to be like that.

Why dossiers end up late

  • Records were kept in paper and email, and have to be found and scanned.
  • The contents weren't agreed, so the format changes at the end.
  • Vendor documents were never chased.
  • Signatures are missing on sheets that were 'done'.

Five habits that fix it

1. Agree the index first

Get the client's dossier index at the start and map each section to where its records will come from in the system.

2. Record digitally, at the point of work

A sheet signed on a phone at the equipment is already in the dossier. A paper sheet is a future scanning job.

3. Track documents as deliverables

Give vendor documents, certificates and as-builts due dates and owners, and chase them like punches.

4. Check completeness per system, every week

Compare expected against received for each system. A gap found in month three is easy to fill. A gap found at handover is a delay.

5. Generate, don't compile

If records are linked to systems, the dossier is a report you run, not a document you build.

The handover pack for a system, generated from its records.

In SureCon

Check sheets, punches, certificates, test packs, photos and documents are all linked to subsystems. The turnover package for a system is generated from them, and sent with a transmittal so the client's receipt is recorded.