12 completions mistakes that delay handover (and how to avoid them)
The mistakes seen again and again on projects of every size, from a late start to measuring the wrong thing.
· 7 min read

Most delayed handovers fail in the same ways. Here are twelve, with the fix for each.
- Starting late. Fix: set up systems, tags and sheets before installation starts.
- A system breakdown nobody agreed. Fix: agree it with commissioning and the client in month one.
- Categories argued at the end. Fix: write them down with examples and get them signed.
- Punches in several places. Fix: one list, raised on a phone with a photo.
- Items with no owner. Fix: company and due date are required, and unassigned is reviewed weekly.
- Paper check sheets. Fix: sign them digitally at the equipment.
- Sheets signed in bulk at the end. Fix: track unsigned sheets older than two weeks.
- Progress typed in, not calculated. Fix: measure from signed records.
- Vendor documents forgotten. Fix: register them with due dates and chase them.
- Preservation skipped. Fix: scheduled routines, recorded on a phone.
- Changes not followed through. Fix: management of change lists affected tags and documents.
- The dossier left to the end. Fix: generate it from records, check completeness weekly.
Every one of these is cheap to fix in month one and expensive to fix in the last month.