What is a walkdown?
A walkdown is a physical inspection of a system or area, usually with the contractor and owner, to find and record punch items before a completion milestone.
Walkdowns are organised by system or subsystem so that everything needed for its certificate is checked. Items are raised on the spot with photos and categories.