Skip to content
All articles

Quality

From ITP to check sheet: let the plan pick the paperwork

Your inspection and test plan already says which records each tag type needs. Here's why your check sheets should come straight from it, automatically.

· 4 min read

Share
Illustration of an inspection and test plan generating check sheets for tags

On most projects someone spends weeks building a giant spreadsheet: every tag, every check sheet it needs, every signature. Then the ITP changes and the spreadsheet is wrong.

The ITP is already the answer

An inspection and test plan lists the activities for a discipline, who inspects them, the hold and witness points, and the record that proves each one. That record is a check sheet. So the ITP already knows which check sheets every tag needs.

Diagram: an approved electrical ITP names check sheet templates, which are created automatically for every electrical tag
The ITP names the records; SureCon creates the check sheets for every matching tag.

How SureCon does it

  • Approve an ITP for a discipline, naming the check sheet templates it uses as records.
  • SureCon creates the right check sheets for every tag of that discipline. Missing sheets are filled in automatically.
  • Import more tags later and their check sheets appear on their own.
  • Start from a standard library covering electrical, instrumentation, mechanical, piping, HVAC, civil, structural and telecom.
  • Tweak a template by describing the change to the AI (“add an insulation resistance reading at 1000 V”), or drag in ready-made blocks.

The result: no master spreadsheet to maintain, no tag without its paperwork, and an ITP that drives the work instead of sitting in a folder.

Try it on your next project. It's free.

SureCon is in public beta and free for every team. Set up your first project in minutes.

Start for free