What is lock-out / tag-out (LOTO)?
Lock-out / tag-out (LOTO) is the procedure for isolating energy sources with locks and tags, and verifying the isolation, so equipment can't be started while people work on it.
Each isolation point, such as a breaker, valve or disconnect, is locked and tagged, and the isolation is tested before work starts. Locks are removed in a controlled order when the work is done.