What is a job safety analysis (JSA)?
A job safety analysis (JSA) breaks a task into steps, identifies the hazards in each and sets controls before the work starts.
JSAs are prepared with the crew doing the work and reviewed on the day. Risk is often scored by likelihood and severity, before and after controls. A shorter field-level hazard assessment (FLHA) is often done at the work face.