Skip to content
Glossary

What is a hold point?

A hold point is a step in an inspection and test plan where work must stop until the named party has inspected and released it.

Hold points are used where later work would hide or prevent the inspection, such as before backfilling, closing a vessel or pressure testing. The contractor requests the inspection in advance and may not proceed without release.