Skip to content
Glossary

What is a check sheet (ITR)?

A check sheet, or inspection and test record (ITR), is the form that proves one tag was installed or tested correctly, line by line, with readings checked against acceptance limits.

Check sheets are grouped by phase: A-sheets for construction, B-sheets for pre-commissioning and C-sheets for commissioning. Each tag type needs its own set: a pump needs an installation check, an alignment check and a performance run.

A sheet shouldn't be signed while any line fails. The completed, verified sheets are the main evidence for completion certificates.