What is a technical query / RFI (TQ)?
A technical query (TQ), or request for information (RFI), is a formal question from site to engineering or the designer to clarify a drawing, specification or requirement.
TQs are numbered and tracked so answers are on record and can be found later. A good answer cites the document it's based on; if it changes the design, it may lead to a management of change.